Three Sixty Solar Identified as Preferred Clean Energy Supplier
MFS intends to install clean energy solutions on planned new construction and retrofitted designs to existing operating film studios.
- MFS intends to install clean energy solutions on planned new construction and retrofitted designs to existing operating film studios.
- Brian Roth, CEO of Three Sixty Solar added, “I’m thrilled that our partnership with Archer has helped them to offer a unique solution to MFS.
- On January 30, 2023, Archer and MFS signed the LOI, stating that, “MFS intends to utilize Archer as the preferred supplier of clean and ‘alternate’ energy solutions specifically, but not limited to, Three Sixty Solar Towers, off-grid utility interconnections, energy storage systems, energy backup power systems, telecom, and EV charging across North America developments”.
- Per the LOI, Archer is granted first right of refusal to propose its energy solutions for MFS’s North American studio developments to meet or exceed MFS’s energy requirements.