Technical report

WEST MINING CORP. CORE SAMPLING PROGRAM DESIGNED TO UPGRADE CURRENT RESOURCE ON ITS 100% OWNED KENA PROJECT

Retrieved on: 
Friday, April 19, 2024

The majority of the core resampling has now been completed with 26 holes remaining to be sampled.

Key Points: 
  • The majority of the core resampling has now been completed with 26 holes remaining to be sampled.
  • Completed resampling to date consists of 438 core samples and 91 QAQC inserted blanks and standards to bring the sampling protocols up to current quality control standards.
  • MSA Labs has high quality standards, including both ISO 17025 (Testing and Calibration Laboratories) accreditation and ISO 9001 (Quality Management Systems) certification.
  • Field inserted standards (certified reference materials) and blanks were purchased from CDN Resource Laboratories Ltd. of Langley, British Columbia.

Atico Reports Consolidated Financial Results for 2023

Retrieved on: 
Tuesday, April 16, 2024

VANCOUVER, British Columbia, April 16, 2024 (GLOBE NEWSWIRE) -- Atico Mining Corporation (the “Company” or “Atico”) (TSX.V: ATY | OTC: ATCMF) today announced its financial results for the year ended December 31, 2023, posting income from mining operations of $7.4 million and a net loss of $5.8 million. Production for the year at Atico’s El Roble mine totaled 13.2 million pounds (“lbs”) of copper and 10,149 ounces (“oz”) of gold in concentrate at a cash cost(1) of $2.04 per payable pound of copper(2).

Key Points: 
  • During the quarter, the Company generated sales of $17.3 million, where copper accounted for 89% and gold for 11%.
  • Atico Mining cordially invites all shareholders to its Annual General Meeting of Shareholders, at 10:00 am, Tuesday, June 18, 2024, at Suite 501 - 543 Granville Street, Vancouver, British Columbia.
  • Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.
  • A focus in 2023 will be on increasing the resource and reserves estimate and extending the El Roble’s life of mine.

Nevada Lithium provides positive update on Hydraulic Borehole Mining method and commences updated Preliminary Economic Assessment for Bonnie Claire Lithium Project, Nevada

Retrieved on: 
Tuesday, April 16, 2024

The Company is also pleased to announce the commencement of an updated Preliminary Economic Assessment (“PEA”) on the Project.

Key Points: 
  • The Company is also pleased to announce the commencement of an updated Preliminary Economic Assessment (“PEA”) on the Project.
  • Nevada Lithium’s CEO, Stephen Rentschler, commented: “Nevada Lithium has received an updated assessment of the Hydraulic Borehole Mining (HBHM) method from an internationally recognized leader in the HBHM mining technique, Kinley Exploration LLC.
  • While this method has been used elsewhere, Bonnie Claire would see its use in the Great Basin for the first time.
  • The objective of this work is to establish a reasonable economic mining strategy to extract lithium in a continuous, cost effective and safe manner.

Vortex Energy Corp. Sends Core Samples from the Robinsons River Salt Project to the University of Alberta

Retrieved on: 
Tuesday, April 16, 2024

VANCOUVER, British Columbia, April 16, 2024 (GLOBE NEWSWIRE) -- Vortex Energy Corp. (CSE: VRTX | OTC: VTECF | FRA: AA3) (“Vortex” or the “Company”) is pleased to announce that it has shipped core samples from the initial hole drilled at the Robinsons River Salt Project to the University of Alberta.

Key Points: 
  • VANCOUVER, British Columbia, April 16, 2024 (GLOBE NEWSWIRE) -- Vortex Energy Corp. (CSE: VRTX | OTC: VTECF | FRA: AA3) (“Vortex” or the “Company”) is pleased to announce that it has shipped core samples from the initial hole drilled at the Robinsons River Salt Project to the University of Alberta.
  • The Company’s consultant, RESPEC Consulting Inc. (“RESPEC”), has conducted core logging on the cap rock and salt sections obtained from Core Hole 1 (VTX-West-23-1).
  • The cap rock is predominantly anhydrite, intermixed with mudstones, while the salt rock is primarily composed of halite, featuring zones of intermixed mudstones and occasional potash salts such as carnallite and possibly sylvite.
  • RESPEC has selected and shipped samples to the University of Alberta, which will perform various tests to delineate the material properties of the cap rock and salt.

Reunion Gold Announces Filing of NI 43-101 Technical Report for Its 100%-Owned Oko West Project

Retrieved on: 
Thursday, April 11, 2024

LONGUEUIL, Quebec, April 11, 2024 (GLOBE NEWSWIRE) -- Reunion Gold Corporation (TSXV: RGD; OTCQX: RGDFF) (the “Company”) is pleased to announce the filing of the National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) entitled “NI 43-101 Technical Report, Oko West Gold Project, Cuyuni-Mazaruni Mining Districts, Guyana” dated April 11, 2024, with an effective date of February 26, 2024 (the “Technical Report”) to support scientific and technical information that relates to the Oko West Project and the updated Mineral Resource Estimate (“MRE”) published on February 26, 2024.

Key Points: 
  • LONGUEUIL, Quebec, April 11, 2024 (GLOBE NEWSWIRE) -- Reunion Gold Corporation (TSXV: RGD; OTCQX: RGDFF) (the “Company”) is pleased to announce the filing of the National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) entitled “NI 43-101 Technical Report, Oko West Gold Project, Cuyuni-Mazaruni Mining Districts, Guyana” dated April 11, 2024, with an effective date of February 26, 2024 (the “Technical Report”) to support scientific and technical information that relates to the Oko West Project and the updated Mineral Resource Estimate (“MRE”) published on February 26, 2024.
  • The updated MRE showed a significant increase in both grades and contained gold within the overall MRE and also included a substantial initial underground MRE.
  • There are no material differences in the Technical Report from the information disclosed in the news release issued on February 26, 2024.
  • The Technical Report was authored by Pascal Delisle, P.Geo., and Neil Lincoln, P.Eng., both of G Mining Services Inc., and Derek Chubb, P.

Surge Copper Outlines Pre-Feasibility Technical Work Programs at Berg and Announces Additional Private Placement for up to $1.0 million

Retrieved on: 
Wednesday, April 10, 2024

Metallurgy – a test work program will aim to advance bulk copper-molybdenum concentrate flotation parameters and to confirm copper, molybdenum, silver, and gold recovery performance into separate copper and molybdenum concentrates.

Key Points: 
  • Metallurgy – a test work program will aim to advance bulk copper-molybdenum concentrate flotation parameters and to confirm copper, molybdenum, silver, and gold recovery performance into separate copper and molybdenum concentrates.
  • This program is fully scoped and suitable composite sample material is available and awaiting shipment.
  • In the event the maximum number of Side-Car Common Shares are issued under the Side-Car Private Placement, a total of 1,764,705 additional Strategic Placement Common Shares will be purchased by ARM under the Strategic Placement, resulting in total gross proceeds to Surge between the Strategic Placement and the Side-Car Private Placement of approximately $5 million.
  • The net proceeds from the Side-Car Private Placement will be used to fund the advancement of the Berg Project, exploration, and for working capital and general corporate purposes.

Caledonia Mining Corporation Plc Blanket Mine Q1 2024 Production

Retrieved on: 
Wednesday, April 10, 2024

Note: The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No.

Key Points: 
  • Note: The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No.
  • 596/2014 (“MAR”) as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 and is disclosed in accordance with the Company's obligations under Article 17 of MAR.
  • Security holders, potential security holders and other prospective investors are cautioned not to place undue reliance on forward-looking information.
  • This news release is not an offer of the shares of Caledonia for sale in the United States or elsewhere.

Vista Gold Corp. Files Feasibility Study Update for the Mt Todd Gold Project

Retrieved on: 
Tuesday, April 16, 2024

Vista Gold Corp. (NYSE American and TSX: VGZ) (“Vista” or the “Company”) today announced that it has filed the feasibility study update for its Mt Todd gold project (“Mt Todd” or the “Project”) located in Northern Territory, Australia in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) disclosure standards on SEDAR+ at www.sedarplus.ca (the “NI 43-101 Report”).

Key Points: 
  • Vista Gold Corp. (NYSE American and TSX: VGZ) (“Vista” or the “Company”) today announced that it has filed the feasibility study update for its Mt Todd gold project (“Mt Todd” or the “Project”) located in Northern Territory, Australia in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) disclosure standards on SEDAR+ at www.sedarplus.ca (the “NI 43-101 Report”).
  • The NI 43-101 Report reflects changes in project economics since the feasibility study report filed in February 2022.
  • Mt Todd mineral resources and mineral reserves, mine plans, gold recoveries, and gold production schedules remain unchanged.
  • The NI 43-101 Report was filed on SEDAR+ on April 16, 2024 and is titled “NI 43-101 Technical Report – Mt Todd Gold Project - 50,000 tpd Feasibility Study – Northern Territory, Australia” with an effective date of March 12, 2024.

IsoEnergy Provides Winter Exploration Update

Retrieved on: 
Thursday, April 25, 2024

SASKATOON, SK, April 25, 2024 /PRNewswire/ - IsoEnergy Ltd. ("IsoEnergy" or the "Company") (TSXV: ISO) (OTCQX: ISENF) is pleased to provide an update on the results of winter 2024 exploration work on its eastern Athabasca Basin uranium properties (Figure 1).

Key Points: 
  • SASKATOON, SK, April 25, 2024 /PRNewswire/ - IsoEnergy Ltd. ("IsoEnergy" or the "Company") (TSXV: ISO) (OTCQX: ISENF) is pleased to provide an update on the results of winter 2024 exploration work on its eastern Athabasca Basin uranium properties (Figure 1).
  • o Results from the winter program have elevated the prospectivity of Hawk to potentially host a large uranium deposit.
  • In summary, the exploration drilling successfully intersected alteration and significant late brittle structures both in the sandstone and the basement (Figure 3).
  • The winter 2024 results have significantly upgraded Target Area A at Larocque East and further drilling is planned for the 2024 summer.

Mandalay Extends the Storheden Gold Deposit Adjacent to the Operating Björkdal Mine

Retrieved on: 
Wednesday, April 24, 2024

This press release is the first in a series of updates on our 2024 regional exploration progress at Björkdal.

Key Points: 
  • This press release is the first in a series of updates on our 2024 regional exploration progress at Björkdal.
  • This deposit has not been thoroughly explored in comparison to our extensive Björkdal deposit however it is showing promising signs of gold mineralization.
  • The Storheden deposit is located roughly 600 m to the Northeast of the Björkdal mine (Figure 2-3).
  • Despite its promising structural setting, the 2023 drilling showed that this area lacks the pervasive veining characterizing the Björkdal and Storheden deposits.