Arya Resources Ltd. (RBZ) Drills 3.5 Kilogram per Tonne (Kg. /t) Copper, 6.1 Kg. /t Nickel, and 0.247 Kg. /t Cobalt over 36.5 meters
The program consisted of 8 drill holes totalling 1045m and was completed between December 7th and 17th, 2023.
- The program consisted of 8 drill holes totalling 1045m and was completed between December 7th and 17th, 2023.
- A powerline runs along Provincial Highway 102 and would provide easy access to hydro for the project site.
- Projected strike of the P-2 Thrust fault which hosts the McArthur River Uranium mine in the Athabasca basin, extends onto the property.
- Basement hosted Uranium deposit(s) could be coming to surface outside the current limits of the Athabasca basin, where the property is located.