Bergby

United Lithium Intersects 1.05% Li₂O over 33 m including 2.42% Li₂O over 7 m, Combined Strike Length Now Exceeds 4,000 m at Bergby Project, Sweden

Retrieved on: 
星期四, 一月 11, 2024

Bergby is a 100%-owned, district-scale, hard rock lithium project covering approximately 8,000 hectares (“ha”) near infrastructure and the coast of the Gulf of Bothnia in Central Sweden.

Key Points: 
  • Bergby is a 100%-owned, district-scale, hard rock lithium project covering approximately 8,000 hectares (“ha”) near infrastructure and the coast of the Gulf of Bothnia in Central Sweden.
  • New drilling assay results for the newly discovered fourth pegmatite “D” include:
    including 2.42 Li2O over 7.04 m from 97.72 m depth.
  • Pegmatite D has now demonstrated a strike length of over seven-hundred metres and remains open, the combined strike of the pegmatites now exceeds four kilometres.
  • This includes a high-grade interval of 2.42% Li2O over 7.04 m from 97.72 m depth down hole (estimated true width of 3.58 m).

United Lithium to Host Webinar November 29th, 2023 Focused on Recent Lithium-Pegmatite Discoveries and Drill Results at the Bergy Project, Sweden

Retrieved on: 
星期一, 十一月 27, 2023

President and CEO Scott Eldridge, and Executive Vice President, Exploration Cathy Fitzgerald, will facilitate the webinar.

Key Points: 
  • President and CEO Scott Eldridge, and Executive Vice President, Exploration Cathy Fitzgerald, will facilitate the webinar.
  • The webinar will focus on the Bergby Project (“Bergby”) lithium-pegmatite discoveries and the latest drilling results, announced November 21, 2023.
  • A recorded version of this webinar will be available at https://unitedlithium.com by December 6th, 2023.
  • The 2023 Drill Program is ongoing, with further results pending, and has been expanded from 4,000 metres (“m”) to 6,000 m due to the encouraging results.

United Lithium Discovers Three New Spodumene Pegmatites – Drilling Returns 1.92% Li₂O over 26.8 m and 1.54% Li₂O over 28 m at Bergby, Sweden

Retrieved on: 
星期二, 十一月 21, 2023

Prospecting and subsequent drilling during 2023 have discovered two new high-grade spodumene-bearing pegmatite bodies, Pegmatites “D” and “E,” bringing the total drilled on the Project to five.

Key Points: 
  • Prospecting and subsequent drilling during 2023 have discovered two new high-grade spodumene-bearing pegmatite bodies, Pegmatites “D” and “E,” bringing the total drilled on the Project to five.
  • The 2023 Drill Program is ongoing, with further results pending, and has been expanded from 4,000 metres (“m”) to 6,000 m due to the encouraging results.
  • The Company will host a webinar on November 29th, 2023, at 1:15 pm PST ( Register Here ).
  • Table 1: Bergby Project November 21, 2023 drill hole information for drilling with reported Li2O assay results.

United Lithium Drill Results Confirm Two New Discoveries at the Bergby Lithium Project Sweden

Retrieved on: 
星期二, 五月 23, 2023

VANCOUVER, British Columbia, May 23, 2023 (GLOBE NEWSWIRE) -- United Lithium Corp. (“United” or the “Company”) (CSE: ULTH ; OTC: ULTHF ; FWB: 0UL A) is pleased to announce that it continues to make lithium pegmatite discoveries at the Bergby Lithium Project (“Bergby” or the “Project”).

Key Points: 
  • VANCOUVER, British Columbia, May 23, 2023 (GLOBE NEWSWIRE) -- United Lithium Corp. (“United” or the “Company”) (CSE: ULTH ; OTC: ULTHF ; FWB: 0UL A) is pleased to announce that it continues to make lithium pegmatite discoveries at the Bergby Lithium Project (“Bergby” or the “Project”).
  • Bergby is a 100% owned, district-scale, hard rock lithium project covering 10,828 hectares (“ha”) near the coast of the Gulf of Bothnia in Central Sweden.
  • Two new lithium rich pegmatites discovered, notable results include:
    Ongoing 4,000 m drill program with initial assay results pending.
  • Drilling results from this program identified two new lithium pegmatite discoveries (at areas B and C - See Figure 1 below).

United Lithium Corp. Provides Corporate Update

Retrieved on: 
星期一, 八月 22, 2022

VANCOUVER, British Columbia, Aug. 22, 2022 (GLOBE NEWSWIRE) -- United Lithium Corp. (CSE: ULTH ; OTC: ULTHF ; FWB: 0ULA ) (ULTH or the Company) is pleased to provide an update on recent exploration activities.

Key Points: 
  • VANCOUVER, British Columbia, Aug. 22, 2022 (GLOBE NEWSWIRE) -- United Lithium Corp. (CSE: ULTH ; OTC: ULTHF ; FWB: 0ULA ) (ULTH or the Company) is pleased to provide an update on recent exploration activities.
  • A 2005 line-kilometre heliborne magnetic and radiometric survey to map lithium bearing pegmatites was completed on the Bergby property in August 2022.
  • United Lithium has identified other areas in the US that have high prospectivity for lithium-bearing pegmatites, or where there has been historical lithium/tantalum production from pegmatites.
  • For further information, please contact the Company at:
    United Lithium Corp. (CSE: ULTH) is an exploration & development company energized by the global demand for lithium.

United Lithium Corp Adds Second Drill to the Bergby Lithium Project

Retrieved on: 
星期四, 二月 17, 2022

VANCOUVER, British Columbia, Feb. 17, 2022 (GLOBE NEWSWIRE) -- United Lithium Corp. (CSE: ULTH ; OTC: ULTHF ; FWB: 0UL ) (ULTH or the Company), is pleased to announce a second rig will begin drilling next week at the Bergby lithium project in Sweden.

Key Points: 
  • VANCOUVER, British Columbia, Feb. 17, 2022 (GLOBE NEWSWIRE) -- United Lithium Corp. (CSE: ULTH ; OTC: ULTHF ; FWB: 0UL ) (ULTH or the Company), is pleased to announce a second rig will begin drilling next week at the Bergby lithium project in Sweden.
  • Doubling the drilling production rate will accelerate the project and enable new target areas to be tested sooner.
  • The Company is seeking to add a third drill to the project, with the capacity to maneuver across rough terrain while maintaining a minimal environmental footprint.
  • On behalf of the Board of Directors,
    For further information, please contact the Company at:
    United Lithium Corp. (CSE: ULTH) is an exploration & development company energized by the global demand for lithium.

United Lithium Corp Intersects Recently Discovered Spodumene-Bearing Pegmatite in 9 Holes

Retrieved on: 
星期四, 一月 27, 2022

VANCOUVER, British Columbia, Jan. 27, 2022 (GLOBE NEWSWIRE) -- United Lithium Corp. (CSE: ULTH; OTC: ULTHF; FWB: 0UL) (“ULTH” or the “Company”), is pleased to announce completion of 9 core drill holes into the recently discovered spodumene bearing pegmatite at the Bergby Lithium project near Gävle in central Sweden. A new spodumene bearing pegmatite was discovered in December 2021, and assays are now available from the discovery hole BBY21069 (as reported January 20, 2022). Drilling continues at this new discovery.

Key Points: 
  • A new spodumene bearing pegmatite was discovered in December 2021, and assays are now available from the discovery hole BBY21069 (as reported January 20, 2022 ).
  • The pegmatite has been traced in drillholes for more than 200m, with a likely fault offset between holes BBY21071/BBY21073 and hole BBY22074.
  • Current hole, BBY22078, is testing for the extension of the spodumene bearing pegmatite 50m to the southwest of recently completed hole BBY22077 which provided two intersections of spodumene bearing pegmatite.
  • This new discovery lies 750 metres northwest of the original Bergby lithium pegmatite discovery drilled in 2017.

United Lithium Corp Discovers Two New Lithium Rich Pegmatites at Bergby Project, Sweden, in ongoing Drill Program

Retrieved on: 
星期四, 一月 20, 2022

VANCOUVER, British Columbia, Jan. 20, 2022 (GLOBE NEWSWIRE) -- United Lithium Corp. (CSE: ULTH; OTC: ULTHF; FWB: 0UL) (“ULTH” or the “Company”) is pleased to announce completion of 42 core drill holes at the Bergby Lithium project near Gävle in central Sweden. A new spodumene bearing pegmatites was discovered in December 2021, with assays available from the discovery hole BBY21069. Drilling continues on this new discovery.

Key Points: 
  • A new spodumene bearing pegmatites was discovered in December 2021, with assays available from the discovery hole BBY21069.
  • Discovery hole BBY21069 intersected 47.75m of 1.34% Li2O from 2.25 m beneath shallow soil cover.
  • This new discovery lies 750 metres northwest of the original Bergby lithium discovery drilled in 2017 (see Figures 2 and 3).
  • The Bergby project remains very unexplored, and we look forward to further testing of this discovery and additional targets in 2022.

United Lithium Corp. Discovers Multiple Lithium Rich Boulder Trains at Bergby – Assays up to 3.33 Li2O

Retrieved on: 
星期四, 九月 30, 2021

These new boulder trains are not related to drilled mineralization and are believed related to new lithium mineralized bodies.

Key Points: 
  • These new boulder trains are not related to drilled mineralization and are believed related to new lithium mineralized bodies.
  • These results include 3.01% Li2O, 2.82% Li2O and 2.12% Li2O (see Table 1 and Figures 1 and 2).
  • The success of this boulder sampling program has encouraged United Lithium to expand the mapping and sampling program.
  • Figure 4 Original and Additional Exploration Permits, Bergby Lithium Project
    Figure 5 Bergby Lithium Project showing Exploration Permits, drilling area, and office/core facilities on Google Earth Satellite Image
    Table 1 Boulder Train assay results, Bergby Lithium Project