Concealed hinge jig

Nine Mile Brook Drill Program Update – Identifies VMS System at “Islands Target Area”

Retrieved on: 
Thursday, May 25, 2023

In drill hole T01B-A-RMI, mineralization near surface and at depth intersected veinlets of VMS mineralization including chalcopyrite (Cu), sphalerite (Zn) and galena (Pb) in a sequence of rocks that typically host VMS deposits.

Key Points: 
  • In drill hole T01B-A-RMI, mineralization near surface and at depth intersected veinlets of VMS mineralization including chalcopyrite (Cu), sphalerite (Zn) and galena (Pb) in a sequence of rocks that typically host VMS deposits.
  • Reinterpretation of the geological setting has also eliminated specific targets and target areas previously classified as priority.
  • As previously announced, Lantech Drilling has been engaged with their mobile track mounted drill for part 2 of the Nine Mile Brook Drill Program.
  • We look forward to the continuation of our fully funded Nine Mile Brook drill program.

Nine Mile Metals Announces Mobilization of Deep Diamond Drill Rig for Phase 2 of Its Nine Mile Brook VMS Drill Program

Retrieved on: 
Tuesday, January 31, 2023

Nine Mile Brook VMS Project resumes its 5000m Stage 2 Drill Program.

Key Points: 
  • Nine Mile Brook VMS Project resumes its 5000m Stage 2 Drill Program.
  • Moncton, New Brunswick based Orbit-Garant Drilling has been secured for our Winter Drill Program at our Nine Mile Brook VMS Project.
  • Their skid mount rig system is winterized, enclosed and more powerful for the deeper portion of our drill program at Nine Mile Brook.
  • EarthEX and our Geological Team are excited to begin this High Priority Deeper Drill phase of our program.

Nine Mile Metals Provides Drilling Program Update at Flagship Nine Mile Book VMS Project

Retrieved on: 
Monday, January 16, 2023

VANCOUVER, British Columbia, Jan. 16, 2023 (GLOBE NEWSWIRE) -- NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”), is pleased to provide an update on the drill program at its flagship Nine Mile Brook VMS Project in the world famous, Bathurst Mining Camp (“BMC”) in New Brunswick. Following data analysis and interpretation by EarthEX Geophysical Solutions Inc. (“EarthEX”) of a 21-line kilometer Induced Polarization (I.P.) survey conducted over the Lens, Islands and Hinge A target areas, a total of eighteen (18) high priority drill holes have been proposed to intersect a variety of high chargeable, conductive, resistive, and magnetic anomalies (Figure 1). This was the direct result of the orientation grid conducted last October that compared IP vs EM designed surveys. The surprising result was that the IP Chargeability of our Willett Lens drill core yielded an extremely high signature that challenged the EM conductivity response. Prior to drilling, EarthEX recommended we conduct a 21-line km IP survey for target definition. This was chosen to identify the copper-gold component of additional Lens’ and the source deposits. The Lantech drill team commenced the drill program on December 4, 2022, completing (3) Lens Area target holes (T03-B, T04-A and Lens Hole NM2208) totaling 521m.

Key Points: 
  • Prior to drilling, EarthEX recommended we conduct a 21-line km IP survey for target definition.
  • The Lantech drill team commenced the drill program on December 4, 2022, completing (3) Lens Area target holes (T03-B, T04-A and Lens Hole NM2208) totaling 521m.
  • “After a very successful California Lake VMS Drill Program, we were extremely eager to drill our Flagship Nine Mile Brook VMS Project.
  • The team looks forward, to the continued drill program in this target rich environment” stated Gary Lohman, B.Sc., P.