Cavite

T.Y. Lin International Wins Detailed Design Engineering Bid for Bataan-Cavite Interlink Bridge in the Philippines

Retrieved on: 
Tuesday, October 27, 2020

Lin International (TYLI), a globally recognized full-service infrastructure consulting firm, announces that TYLI has won the bid to provide the Detailed Design Engineering (DED) for the new Bataan-Cavite Interlink Bridge in the Philippines.

Key Points: 
  • Lin International (TYLI), a globally recognized full-service infrastructure consulting firm, announces that TYLI has won the bid to provide the Detailed Design Engineering (DED) for the new Bataan-Cavite Interlink Bridge in the Philippines.
  • The DED phase for the landmark bridge will be carried out over the next 15 months.
  • Called the North Channel Bridge and South Channel Bridge, the structures will have main spans of 400 meters and 900 meters, respectively.
  • Lin International is honored to provide the Detailed Engineering Design of the Bataan-Cavite Interlink Bridge, said Marwan Nader, Ph.D., P.E., TYLI Senior Vice President, Technical Director - Bridge Line of Business.