Montmorency Falls

TYLin Selected as Lead Bridge Engineer for New Île d’Orléans Bridge

Retrieved on: 
Jeudi, avril 18, 2024

TYLin’s client, GHIO, consists of Dragados Canada, Inc. and EBC, who was awarded the contract to build the new bridge.

Key Points: 
  • TYLin’s client, GHIO, consists of Dragados Canada, Inc. and EBC, who was awarded the contract to build the new bridge.
  • The new Île-d'Orléans Bridge will redefine the connectivity between the Capitale-Nationale and the emblematic destination that is the territory of Île d'Orléans.
  • The bridge consists of a 520-metre-long north approach; a 790-metre-long, three-span cable-stayed bridge; and a 740-metre-long south approach.
  • TYLin’s team for the successful design of the Samuel De Champlain Bridge will come together again for the Île d'Orléans Bridge project.