Tropical climate

Southeast Asia Data Center Construction Industry Outlook & Forecast 2024-2029: Batam, Bekasi, Jakarta, Johor, West Java, Cyberjaya, Manila, Chon Buri, Ho Chi Minh City, Bangkok Have Become DC Hubs - ResearchAndMarkets.com

Retrieved on: 
Mercredi, mai 29, 2024

The major hyperscale operators investing in the Southeast Asia data center construction market include Amazon Web Services (AWS), Microsoft, Meta (Facebook), and Google.

Key Points: 
  • The major hyperscale operators investing in the Southeast Asia data center construction market include Amazon Web Services (AWS), Microsoft, Meta (Facebook), and Google.
  • This trend is expected to drive increased investments in the Southeast Asia data center construction market in the foreseeable future.
  • What is the estimated market size in terms of area in the Southeast Asia data center construction market by 2029?
  • How many MW of power capacity is expected to reach the Southeast Asia data center construction market by 2029?

SIGMA LITHIUM INCREASES PROVEN & PROBABLE OPEN PIT MINERAL RESERVE BY 40% TO 77Mt EXTENDING OPERATIONS TO 25 YEARS

Retrieved on: 
Mercredi, mai 8, 2024

SÃO PAULO, May 8, 2024 /PRNewswire/ -- Sigma Lithium Corporation ("Sigma Lithium" or the "Company") (NASDAQ: SGML, BVMF: S2GM34, TSXV: SGML), a leading global lithium producer dedicated to powering the next generation of electric vehicles with carbon neutral, socially and environmentally sustainable lithium concentrate, announces it is increasing its Proven and Probable Mineral Reserves at its 100% owned Grota do Cirilo operation at Vale do Jequitinhonha by 40%, equivalent to 22.2 million tonnes.

Key Points: 
  • Sigma Lithium is increasing its Proven and Probable Reserve balance by 40% to 77.0 million tonnes from 54.8 million tonnes.
  • The entirety of this mineral Reserve balance is feasible through low-cost, open pit, mining operations, consolidating the Company's position as a low-cost producer of Quintuple Zero High Purity Lithium materials.
  • Increased Proven and Probable Reserves lengthens the duration of Sigma's integrated industrial-mining operations to an estimated 25 years at two phases of processing capacity at 520,000 tonnes/year.
  • The Company is increasing its consolidated Proven and Probable Reserve balance to 77.0 million tonnes at 1.40% lithium oxide (Li2O) from 54.8 million tonnes at 1.44% prior.

Global Sustainable Data Center Market Outlook and Forecasts 2024-2028: Increased Focus On Renewable Energy Sources and Efficient Cooling

Retrieved on: 
Mercredi, mars 20, 2024

DUBLIN, March 20, 2024 /PRNewswire/ -- The "Global Sustainable Data Center Market - Outlook & Forecast 2023-2028" report has been added to ResearchAndMarkets.com's offering.

Key Points: 
  • DUBLIN, March 20, 2024 /PRNewswire/ -- The "Global Sustainable Data Center Market - Outlook & Forecast 2023-2028" report has been added to ResearchAndMarkets.com's offering.
  • QTS Realty Trust meets 35% of its energy requirements from renewable energy with a target of 100% renewable energy by 2025.
  • Efficient and sustainable power infrastructure replacing traditional power systems supports sustainable data center market growth.
  • Hyperscale operators such as AWS, Microsoft, Apple, and Google are leading in using sustainable materials for data center construction, propelling the sustainable data center market.

Appia Announces Outstanding Re-Assayed Diamond Drill Results Including 100 Metres Averaging 3,577 PPM TREO at Its PCH Ionic Clay Project, Brazil

Retrieved on: 
Jeudi, février 8, 2024

Key Weighted Average TREO Concentrations: 0-100 Metres 3,577 PPM, 0-18 Metres 9,445 PPM, Including 7 Metres 18,275 PPM, 3 Metres 25,317 PPM, and 1.5 Metres 30,642 PPM

Key Points: 
  • This Reverse Circulation (RC) hole revealed TREO results as high as 92,758 ppm from 10-to-12 metres, with a total weighted average of 38,655 ppm TREO from 0 to 24 metres, remaining open at depth."
  • (See press release dated January 16, 2024 HERE )
    Burega continued, "We have seen remarkable grades across Target IV, spanning from RC to DDH results.
  • Numerous intercepts surpass 10,000 ppm TREO, including PCH-F01R, where the results support the ultra-high grade weathered profile.
  • The historic diamond drill holes, including DDH-PCHF01, are NQ size (47.6 mm diameter) vertical and reported intervals are true widths.

Latin America Green Data Center Market Analysis Report 2023-2028: Liquid Immersion & D2C Cooling Adoption Driven by AI & Hpc Applications

Retrieved on: 
Mercredi, janvier 17, 2024

DUBLIN, Jan. 16, 2024 /PRNewswire/ -- The "Latin America Green Data Center Market - Industry Outlook & Forecast 2023-2028" report has been added to ResearchAndMarkets.com's offering.

Key Points: 
  • DUBLIN, Jan. 16, 2024 /PRNewswire/ -- The "Latin America Green Data Center Market - Industry Outlook & Forecast 2023-2028" report has been added to ResearchAndMarkets.com's offering.
  • In Latin America, innovations in data center power technology include the adoption of lithium-ion and smart grid UPS systems and DRUPS systems.
  • In Latin America, many operators have limited funds for data center development, making it an attractive proposition for deploying modular data centers.
  • The cost of operating a modular data center is around 30% less than that of a traditional data center facility.

Appia Reports 92,758 ppm (9.3%) TREO, 13,798 ppm MREO (1.38%) and 2,241 (.24%) ppm HREO over 2m Within the Total Weighted Average of 38,655 ppm (3.87%) TREO, 6,869 ppm (.69%) MREO, and 1,380 ppm (.14%) HREO Across 24m (EOH) Following the Reanalysis of Ove

Retrieved on: 
Mardi, janvier 16, 2024

The PCH Project is located within the Tocantins Structural Province in the Brasília Fold Belt, more specifically, the Arenópolis Magmatic Arc.

Key Points: 
  • The PCH Project is located within the Tocantins Structural Province in the Brasília Fold Belt, more specifically, the Arenópolis Magmatic Arc.
  • The PCH Project is 17,551.07 ha in size and located within the Goiás State of Brazil.
  • It is classified as an alkaline intrusive rock occurrence with highly anomalous REE and Niobium mineralization.
  • The rigorous procedures implemented during the sample collection, preparation, and analysis stages underscore the robustness and reliability of the analytical results obtained.

Appia Reports New Assay Results Increasing the Total Weighted Average to 2,287 PPM TREO Across 57 RC Drill Holes at its PCH Ionic Clay Project, Brazil

Retrieved on: 
Jeudi, novembre 9, 2023

The total weighted average across 57 RC drill holes reported to date is 2,287 parts per million (PPM) or 0.23% Total Rare Earth Oxides (TREO).

Key Points: 
  • The total weighted average across 57 RC drill holes reported to date is 2,287 parts per million (PPM) or 0.23% Total Rare Earth Oxides (TREO).
  • The PCH Ionic Clay Project continues to showcase impressive distribution, width, and grades, underscoring its significant potential.
  • - 27,189 ppm or 2.72% TREO, 6,293 ppm or 0.63% MREO, 1,369 ppm or 0.14% HREO, and 25,819 ppm or 2.59% Light Rare Earth Oxides (LREO).
  • To view an enhanced version of this graphic, please visit:
    Table #1 - Denotes weighted average chemical assay results of composites RC samples from PCH-RC-001 to PCH-RC-017.

Appia Announces Closing of PCH Project Acquisition

Retrieved on: 
Lundi, décembre 11, 2023

The Shares are subject to a hold period expiring on April 12, 2024.

Key Points: 
  • The Shares are subject to a hold period expiring on April 12, 2024.
  • For particulars of the transaction, see the December 4, 2023 press release [ Click Here ].
  • The PCH Project is located within the Tocantins Structural Province in the Brasília Fold Belt, more specifically, the Arenópolis Magmatic Arc.
  • The PCH Project is 17,551.07 ha in size and located within the Goiás State of Brazil.

Appia Announces Closing of PCH Project Acquisition

Retrieved on: 
Lundi, décembre 4, 2023

Appia will acquire incremental vested interests in the Company upon completion of specific expenditure requirements pursuant to the terms of the Definitive Agreement.

Key Points: 
  • Appia will acquire incremental vested interests in the Company upon completion of specific expenditure requirements pursuant to the terms of the Definitive Agreement.
  • Should Appia fail to make some or all of the expenditures required in any year, Beko will notify APPIA in writing of such failure, after which Appia will have 30 days to make the required expenditure.
  • The PCH Project is located within the Tocantins Structural Province in the Brasília Fold Belt, more specifically, the Arenópolis Magmatic Arc.
  • The PCH Project is 17,551.07 ha in size and located within the Goiás State of Brazil.

Appia Discovers an Unprecedented High-Grade Mineralized Zone: Total Weighted Average Grade of 7,578 ppm or 0.76% Total Rare Earth Oxide Across 10 Reverse Circulation Drill Holes at Its PCH Ionic Clay Project, Brazil

Retrieved on: 
Mardi, novembre 28, 2023

To view an enhanced version of this graphic, please visit:

Key Points: 
  • To view an enhanced version of this graphic, please visit:
    Chart #2 - Denotes the Drill Log from CH -RC-066.
  • To view an enhanced version of this graphic, please visit:
    Chart #3 - Denotes the Drill Log from CH -RC-067.
  • The PCH Project is located within the Tocantins Structural Province in the Brasília Fold Belt, more specifically, the Arenópolis Magmatic Arc.
  • Reverse circulation (RC) drill holes are vertical and reported intervals are true thicknesses.. Each are sampled at one metre intervals, resulting in average sample sizes of 5-25 kg.