CENTURY LITHIUM ANNOUNCES POSITIVE FEASIBILITY STUDY FOR THE CLAYTON VALLEY LITHIUM PROJECT, NEVADA
The QP for the estimate is Ms. Terre Lane, MMSA, an employee of GRE and independent of Century.
- The QP for the estimate is Ms. Terre Lane, MMSA, an employee of GRE and independent of Century.
- Metallurgical testing through 2020 focused on using sulfuric acid (H2SO4) to extract lithium from the clay.
- A lithium recovery of 78% is used in the Feasibility Study, based on the data collected in over two years of operations at the Pilot Pant.
- Contributors to the estimates are GRE (mining), Wood (process plant and infrastructure), ThyssenKrupp Nucera (chlor-alkali plant) and Century Lithium (property information and owners' costs).