Kiboko Drills 4.2 g/t Au Over 5 m at its Harricana Gold Project
Retrieved on:
måndag, juli 10, 2023
Mining, Minerals, Natural Resources, Amos, Vein, Technical report, Lot, Multimedia, QA/QC, RC, Exploration, Gold, MSA, Hyperaccumulators table – 3, Collection, Nature, Laboratory, Project, Accreditation, Harricana River, Marcotte, News, Bunkhouse, Engineered wood, Printed circuit board, Uranium mining, HB
Kiboko Gold Inc. (TSXV: KIB) (“Kiboko” or the “Company”) today reported results from the remaining 25 holes (4,846 metres (“m”)) of its systematic 70-hole (11,269 m) Phase 1 verification exploration program at its Harricana Gold Project, located 55 kilometres (“km”) north of Val-d’Or, Québec.
Key Points:
- Kiboko Gold Inc. (TSXV: KIB) (“Kiboko” or the “Company”) today reported results from the remaining 25 holes (4,846 metres (“m”)) of its systematic 70-hole (11,269 m) Phase 1 verification exploration program at its Harricana Gold Project, located 55 kilometres (“km”) north of Val-d’Or, Québec.
- Jeremy Link, President and Chief Executive Officer, stated, "Our drilling at Harricana continues to intersect significant intervals of mineralization, including visible gold.
- Although our drilling in the structurally complex Hooper-Bunkhouse zone intersected significant gold mineralization, including visible gold, it did not always replicate the historical intervals.
- In Kiboko’s Phase 1 program, 25 holes (4,846 m) were drilled at the HB and Lot 14 zones of the Fontana area of the Harricana Gold Project, which are identified in Figure 1.