Pan American Energy Announces Final Drill Results from 2023/2024 Program at the Big Mack Lithium Project, including 1.71% Li2O over 19.65 m at the Eleven Zone Pegmatite

Holes BM24-049 and BM24-050 were infill holes targeting the Big Mack Deposit, and BM24-059 was an infill hole on targeting the Eleven zone pegmatite.