Stantec Selected as Lead Designer for Largest Construction Project in Chicago Transit History
Retrieved on:
星期二, 一月 15, 2019
Chicago has the second-busiest mass rail transit system in the United States, sections of which are more than a century old.
Key Points:
- Chicago has the second-busiest mass rail transit system in the United States, sections of which are more than a century old.
- The Design-Build Team of Walsh-Fluor, which includes Walsh Construction and Fluor Enterprises, Inc. as the Lead Contractors, was selected by the Chicago Transit Board in December.
- Stantec was selected to be the preferred Lead Designer for the Joint Venture pursuit in the fall of 2015.
- This is a pivotal project for Chicago Transit, and one of the more significant transit modernization programs in Chicagos history, says Stuart Lerner, executive vice president of Infrastructure at Stantec.