SLAM CEO Talking About Mine Road Acquisition at PDAC
Historic Mine Road Drilling: Diamond drill hole IL2014-003 cored a 9 metre interval grading 14.51% zinc, 5.86% lead, 0.67% copper and 139.9 g/t silver on the Railroad zone.
- Historic Mine Road Drilling: Diamond drill hole IL2014-003 cored a 9 metre interval grading 14.51% zinc, 5.86% lead, 0.67% copper and 139.9 g/t silver on the Railroad zone.
- Drill-Ready VMS Targets At Mine Road: The Railroad and Roche zones are open to test for potential extensions at depth and along strike.
- Infrastructure: The Mine Road project is located on the Mine Road (Route 430) which connects the former Heath Steele mine to the city of Miramichi 60 kilometres to the southeast.
- Mine Road Project: SLAM has acquired 3 additional mineral claims since acquisition of the Mine Road project.