OROCO EXPANDS NORTH ZONE DRILLING
The Company has now completed 43 drill holes (28,119 m of drilling) in its 2021-2022 North Zone drilling confirming good grade mineralization along 1,700 m of strike, demonstrating a westward dipping panel with consistent grades down-dip to about 400-500 m depth below the ridge, bottoming about sea level.
- The Company has now completed 43 drill holes (28,119 m of drilling) in its 2021-2022 North Zone drilling confirming good grade mineralization along 1,700 m of strike, demonstrating a westward dipping panel with consistent grades down-dip to about 400-500 m depth below the ridge, bottoming about sea level.
- Importantly, the drill program has confirmed and expanded a zone of shallow-seated higher-grade mineralization extending down the central spine of the North Zone that is amenable to early year, low strip, open pit mining and delineated a mineralized hanging wall zone to the west of the Gradeshell that comes close to surface under the Santo Tomas ridge.
- The Companys 2022 South Zone drill program includes 18 holes that are expected to be completed by the end of November, with 13 holes (7,964 m of drilling) completed to date.
- Oroco does not assume any obligation to update the forward-looking statements should they change, except as required by law.