Consolidated Lithium Announces Vallée JV Intersects 1.04% Li2O over 7.15 m
The 2023 summer drilling program succeeded at tracing lithium-bearing pegmatite mineralization associated with the adjacent NAL operating lithium mine across the entire width of the Vallée JV property (the “JV Property”) from northwest to southeast (see Figure 2).
- The 2023 summer drilling program succeeded at tracing lithium-bearing pegmatite mineralization associated with the adjacent NAL operating lithium mine across the entire width of the Vallée JV property (the “JV Property”) from northwest to southeast (see Figure 2).
- The 2023 program extended the Core Pegmatite 700 m to the southeast from the area defined by CLM’s 2021 and 2022 drilling programs.
- The Company’s East Vallée project is located immediately adjacent to the JV Property (see Figures 2 and 3).
- The East Vallée project overlies an additional 5 km of the Vallée Lithium Trend that has never been drill-tested for lithium (see Figure 2).