Monument Announces Completion of Upscaled Phase 1 Drilling in the Field at the Murchison Gold Project
Retrieved on:
Monday, September 20, 2021
Review, RC, FSE, Master of Engineering, Orientation, RAB, Program, Authaal, Growth, Safety, Laboratory, WA, North Up Alliance, Resource management, Social responsibility, Industry, MAIG, BSZ, Health, Technical report, AC, SRK, Consultant, Technical, Groundwater, Pressure regulator, Monument, Company, Face, Banded iron formation, Speech scroll, Short form, Gold, BIF, GLOBE, Tuckanarra, Western Australia, Strike, Mining, Element, ALS, Oil, Tunnel, Uranium, Rare-earth element, Road, Printed circuit board, Granite
In addition, the drilling tested the strike continuation at Munro Bore Extension that is adjacent to Munro Bore (not owned by Monument).
Key Points:
- In addition, the drilling tested the strike continuation at Munro Bore Extension that is adjacent to Munro Bore (not owned by Monument).
- All drilling completed by Monument utilized the following procedures and methodologies and was carried out under the supervision of Monument personnel.
- The project area covers the eastern margin of the Meekatharra-Wydgee greenstone belt within the north-eastern Murchison domain.
- Monument Mining Limited (TSX-V: MMY, FSE:D7Q1) is an established Canadian gold producer that owns and operates the Selinsing Gold Mine in Malaysia.