Power Nickel closes final tranche of financing and releases results of the first hole of the current campaign
Power Nickel is pleased to release the assay results for the step out hole testing the Nisk Main Deposit 300 metres to the south and east of previous drilling.
- Power Nickel is pleased to release the assay results for the step out hole testing the Nisk Main Deposit 300 metres to the south and east of previous drilling.
- This was a big step out hole almost 300 metres below the nearest successful hole on that side of the fault.
- Figure 4 below shows the location of hole PN-23-036 with respect to the interpreted geology of Nisk Main area.
- Kenneth Williamson, Géo, M.Sc., VP Exploration at Power Nickel, is the qualified person who has reviewed and approved the technical disclosure contained in this news release.