Significant Drill Results at Becher
VANCOUVER, British Columbia, Feb. 13, 2024 (GLOBE NEWSWIRE) -- Novo Resources Corp. (Novo or the Company) (ASX: NVO) (TSX: NVO & NVO.WT.A) (OTCQX: NSRPF) is pleased to provide an update on drilling results at the Becher Project, which is part of the Egina earn-in and joint venture (Egina JV) with De Grey Mining (ASX:DEG).
- The Egina Gold Camp is Novo’s highly prospective gold belt in the Pilbara and includes the priority Becher and Nunyerry projects (Figure 1).
- No assurance can be given that a similar (or any) commercially viable mineral deposit will be determined at Novo’s Becher Project.
- No significant results (>0.1 g/t Au) were returned from AC drilling at Irvine or Bonatti, although RC hole MSRC0030 at Irvine returned 1 m @ 6.3 g/t Au (Appendix 1 – Table 1).
- One metre AC drill samples are collected from the drill rig through a cyclone and placed on the ground in piles for geological quantitative and qualitative logging.