Technical Report Archive & Image Library

SPEY RESOURCES NI 43-101 CANDELA II INFERRED MINERAL RESOURCE 48KT LCE FROM 86KT OF CONTAINED LITHIUM METAL

Retrieved on: 
Tuesday, September 26, 2023

Although the Mineral Resources presented in the table above are believed to have a reasonable expectation of being extracted economically, they are not Mineral Reserves.

Key Points: 
  • Although the Mineral Resources presented in the table above are believed to have a reasonable expectation of being extracted economically, they are not Mineral Reserves.
  • The Mineral Resources presented above are not Mineral Reserves, and do not reflect demonstrated economic viability.
  • There is no certainty that all or any part of the Mineral Resource will be converted into a Mineral Reserve.
  • Spey Resources SA (“SRS”) is finalising the shareholder agreement (“Shareholder Agreement”) between AIS Resources SA (“AISSA”) and SRS for the development of the Candela II concession.

Giga Metals Announces Positive Pre-Feasibility Study for the Turnagain Nickel-Cobalt Deposit

Retrieved on: 
Friday, September 22, 2023

VANCOUVER, British Columbia, Sept. 22, 2023 (GLOBE NEWSWIRE) -- Giga Metals Corp. (TSX.V: GIGA) ("Giga Metals" or the "Company") today announced the results of a Pre-Feasibility Study (PFS) prepared in accordance with National Instrument 43-101 for the Turnagain Nickel-Cobalt Project located in British Columbia, Canada.

Key Points: 
  • VANCOUVER, British Columbia, Sept. 22, 2023 (GLOBE NEWSWIRE) -- Giga Metals Corp. (TSX.V: GIGA) ("Giga Metals" or the "Company") today announced the results of a Pre-Feasibility Study (PFS) prepared in accordance with National Instrument 43-101 for the Turnagain Nickel-Cobalt Project located in British Columbia, Canada.
  • Turnagain is owned by Hard Creek Nickel Corp, a joint venture owned by Giga Metals (85%) and Mitsubishi Corporation (15%).
  • MHP and Class I nickel demand is growing for the electric vehicle (EV) market, particularly materials sourced in a socially and environmentally responsible manner.
  • The Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context.

Barrick’s Embedded Growth Projects to Drive Value with 30% Rise in Production

Retrieved on: 
Tuesday, September 12, 2023

TORONTO, Sept. 12, 2023 (GLOBE NEWSWIRE) -- Barrick Gold Corporation (NYSE:GOLD)(TSX:ABX) – With the potential embedded in its growth project portfolio, Barrick plans to double its copper production by the end of the decade and continue to increase it to an estimated 1 billion pounds or 450,000 tonnes of copper per annum by 2031, says president and chief executive Mark Bristow.1

Key Points: 
  • Barrick's 15-year production profile for Nevada Gold Mines is based on the same assumptions as the ten-year base case production profile detailed above.
  • All mineral reserve and mineral resource estimates are estimated in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
  • Gold Equivalent Ounces from copper assets are calculated using a gold price of $1,300/oz and a copper price of $3.00/lb.
  • Project capital expenditures represent the capital spending at new projects and major, discrete projects at existing operations intended to increase net present value through higher production or longer mine life.

GoldMining Announces Filing of PEA Technical Report For La Mina Project, Colombia

Retrieved on: 
Thursday, September 7, 2023

Compared to the PEA figures disclosed by the Company in the news release dated July 24, 2023, the results announced herein and in the Technical Report include minor corrections primarily to address the accounting of plant availability and clarifications on specific calculations.

Key Points: 
  • Compared to the PEA figures disclosed by the Company in the news release dated July 24, 2023, the results announced herein and in the Technical Report include minor corrections primarily to address the accounting of plant availability and clarifications on specific calculations.
  • The PEA study results of La Mina are preliminary in nature and are intended to provide an initial assessment of the project's economic potential and development options.
  • Readers should refer to the full text of the Technical Report, which is titled "NI 43-101 Technical Report and Preliminary Economic Assessment for the La Mina Project", with an effective date of July 24, 2023 and is filed under the Company's profile at www.sedarplus.ca .
  • Paulo Pereira, P.Geo., President of GoldMining, has reviewed and approved the technical information contained in this news release.

Torex Gold Reports Results From 2023 Drilling at EPO

Retrieved on: 
Tuesday, September 5, 2023

Gold is analyzed at the BV facilities in Hermosillo, Mexico following internal analytical protocols (FA430) and comprises a 30g fire assay with an atomic absorption finish.

Key Points: 
  • Gold is analyzed at the BV facilities in Hermosillo, Mexico following internal analytical protocols (FA430) and comprises a 30g fire assay with an atomic absorption finish.
  • Samples yielding results >10 g/t Au are re-assayed by fire assay with gravimetric finish (FA530-Au).
  • The program includes 5% each of Certified Reference Materials and Blanks; blind duplicates are not included, but Torex evaluates the results of internal BV laboratory duplicates.
  • Ms. Milla consents to the inclusion in this release of said data in the form and context in which they appear.

Aura Minerals Completes Feasibility Study for the Borborema Project and Increases Ownership Stake in Borborema Inc. to 100%

Retrieved on: 
Wednesday, August 30, 2023

The mine production schedule delivers 22.5 Mt of ore grading 1.12 g/t gold to the mill over the LOM.

Key Points: 
  • The mine production schedule delivers 22.5 Mt of ore grading 1.12 g/t gold to the mill over the LOM.
  • Low grade ore will be stockpiled during the operation and reclaimed at the end of the LOM or when required.
  • (“Deswik Brazil") to jointly prepare with the Aura Technical Services group a Feasibility Study on the Borborema Project.
  • The Feasibility Study also provides an update on the ownership status of the project, Mineral Resources (reported inclusive of Mineral Reserves), Mineral Reserves and project economics.

New Study Warns About Impending Financial Cliff for Nebraska’s Early Childhood System

Retrieved on: 
Wednesday, August 9, 2023

This comes as a new analysis from the Buffett Institute suggests that Nebraska is still not fully funding early childhood care and education.

Key Points: 
  • This comes as a new analysis from the Buffett Institute suggests that Nebraska is still not fully funding early childhood care and education.
  • The new brief builds on the work of the Nebraska Early Childhood Workforce Commission , which called for fully funding the state’s early childhood system by 2030.
  • “The Nebraska Early Childhood Funding Map helps users see the current complexity involved in financing Nebraska’s early childhood system while also exploring individual pathways within it,” said Huddleston-Casas.
  • The Buffett Early Childhood Institute at the University of Nebraska promotes the development and learning of children from birth through age 8.

Osisko Development Reports Second Quarter 2023 Results

Retrieved on: 
Tuesday, August 8, 2023

MONTREAL, Aug. 08, 2023 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE: ODV, TSXV: ODV) ("Osisko Development" or the "Company") is pleased to report its financial and operating results for the three months ended June 30, 2023 ("Q2 2023").

Key Points: 
  • (All monetary references are expressed in Canadian dollars, unless otherwise indicated)
    MONTREAL, Aug. 08, 2023 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE: ODV, TSXV: ODV) ("Osisko Development" or the "Company") is pleased to report its financial and operating results for the three months ended June 30, 2023 ("Q2 2023").
  • Assay results for an additional 14 holes was released on July 18, 2023 (see Subsequent to Q2 2023).
  • On June 27, 2023, the Company also released underground sampling results from its ongoing 2023 exploration program at Trixie.
  • On July 18, 2023, the Company disclosed assay results from 14 diamond drilling holes and chip sampling results from new development areas from its ongoing 2023 underground infill and exploration program at Trixie.

Mayfair Gold Reports Positive Results from Ongoing Metallurgical Testing

Retrieved on: 
Tuesday, August 1, 2023

VANCOUVER, British Columbia, Aug. 01, 2023 (GLOBE NEWSWIRE) -- Mayfair Gold Corp. (“Mayfair” or the “Company”) (TSX-V: MFG; OTCQB: MFGCF) is pleased to report positive results from the Company’s ongoing metallurgical test program on mineral samples from the Company’s 100% controlled Fenn-Gib deposit located in the Timmins region of Northeast Ontario.

Key Points: 
  • VANCOUVER, British Columbia, Aug. 01, 2023 (GLOBE NEWSWIRE) -- Mayfair Gold Corp. (“Mayfair” or the “Company”) (TSX-V: MFG; OTCQB: MFGCF) is pleased to report positive results from the Company’s ongoing metallurgical test program on mineral samples from the Company’s 100% controlled Fenn-Gib deposit located in the Timmins region of Northeast Ontario.
  • Metallurgical test work was completed at SGS-Lakefield (“SGS”) under the guidance of Mr. Steve Haggarty, P.Eng.
  • The improved metallurgical recoveries are included in the recently published July 26, 2023 Fenn-Gib Project NI-43101 Technical Report, with an effective date of April 6, 2023.
  • The clean pyrite concentrate is attractive as a smelter feed providing a fuel source with payable gold content.

Mayfair Gold Files NI 43-101 Technical Report for Fenn-Gib Gold Deposit

Retrieved on: 
Wednesday, July 26, 2023

The Report was prepared by Tim Maunula, P. Geo, of T. Maunula & Associates Consulting Inc., and Steven Haggarty, P.

Key Points: 
  • The Report was prepared by Tim Maunula, P. Geo, of T. Maunula & Associates Consulting Inc., and Steven Haggarty, P.
  • Eng., of Haggarty Technical Services Corporation, each a “Qualified Person” as defined in NI 43-101.
  • The Report supports the scientific and technical disclosure in the updated mineral resource estimate contained in the Company's news release dated June 14, 2023.
  • The disclosure of technical and scientific information in this news release has been reviewed and approved by Tim Maunula, P.