AAS

HotelPlanner Reaches for the Stars with the American Astronomical Society

Retrieved on: 
Wednesday, February 14, 2024

WEST PALM BEACH, Fla., Feb. 14, 2024 (GLOBE NEWSWIRE) -- HotelPlanner, a leading travel technology platform and hotel booking engine, today announced a service provider partnership with the American Astronomical Society .

Key Points: 
  • WEST PALM BEACH, Fla., Feb. 14, 2024 (GLOBE NEWSWIRE) -- HotelPlanner, a leading travel technology platform and hotel booking engine, today announced a service provider partnership with the American Astronomical Society .
  • Now celebrating its 125th anniversary, the American Astronomical Society (AAS) provides a community of astronomers and advocates for science to enhance and share humanity’s scientific understanding of the universe.
  • With more than 8,000 members globally, AAS is a major international organization of professional astronomers, astronomy educators, and amateur astronomers.
  • “HotelPlanner offers incredible value to our membership base through discounted hotel solutions globally,” says Rod Nenner, Chief Business Officer & Director, Strategic Partnerships, American Astronomical Society.

Chesapeake Announces Preliminary Metallurgical Test Results Demonstrating up to 97% Gold Recoveries at Lucy Project

Retrieved on: 
Tuesday, February 13, 2024

Four holes were selected across the Lucy mineralized corridor (Figure 1) for the initial metallurgical test work.

Key Points: 
  • Four holes were selected across the Lucy mineralized corridor (Figure 1) for the initial metallurgical test work.
  • The composites were crushed and ground to 80% passing 75µm, and bottle roll tests were undertaken for 72 hours.
  • Furthermore, a duplicate set of the composites was rerun during a separate test of 96 hours and returned similar results within ±1% of the initial tests, affirming these positive results.
  • The Lucy project comprises 483 hectares and is located within 5 kilometres from a paved highway.

EQS-News: North Peak Announces Results of Dump Sampling Program on Prospect Mountain, Eureka, Nevada

Retrieved on: 
Monday, February 5, 2024

Calgary, Alberta--(Newsfile Corp. - January 31, 2024) - North Peak Resources Ltd. (TSXV: NPR) (the "Company" or "North Peak") announces results from the first phase of sampling of surface workings on its Prospect Mountain property in Eureka, Nevada (the "Property"). As part of a surface mapping project, some of the dumps, numerous surface shafts, adits and scrapes were assayed.

Key Points: 
  • North Peak Announces Results of Dump Sampling Program on Prospect Mountain, Eureka, Nevada
    The issuer is solely responsible for the content of this announcement.
  • Calgary, Alberta--(Newsfile Corp. - January 31, 2024) - North Peak Resources Ltd. (TSXV: NPR) (the "Company" or "North Peak") announces results from the first phase of sampling of surface workings on its Prospect Mountain property in Eureka, Nevada (the "Property").
  • Twelve samples returned grades > 5 g/t Au, and averaged 10.34 g/t Au, 200.8 g/t Ag, 0.20% Cu, 2.96% Pb, 1.30% Zn.
  • The Company's QA/QC program includes the regular insertion of blanks and standards into the sample shipments, as well as instructions for duplication.

Solaris Commences 2024 Drilling Program at Warintza Project

Retrieved on: 
Monday, January 22, 2024

VANCOUVER, British Columbia, Jan. 22, 2024 (GLOBE NEWSWIRE) -- Solaris Resources Inc. (TSX: SLS; OTCQB: SLSSF) (“Solaris” or the “Company”) is pleased to announce a corporate update including the commencement of the 2024 drilling program at its Warintza Project (“Warintza” or “the Project”) in southeastern Ecuador.

Key Points: 
  • VANCOUVER, British Columbia, Jan. 22, 2024 (GLOBE NEWSWIRE) -- Solaris Resources Inc. (TSX: SLS; OTCQB: SLSSF) (“Solaris” or the “Company”) is pleased to announce a corporate update including the commencement of the 2024 drilling program at its Warintza Project (“Warintza” or “the Project”) in southeastern Ecuador.
  • The 2024 drilling program has commenced with the first rig turning at Warintza East and a total of six rigs planned to be in operation by the end of February.
  • Field programs are underway to define drill targets at prospective areas identified in the regional exploration program (refer to press release dated January 8, 2024).
  • Solaris is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data referred to herein.

BatteroTech's BTL Cylindrical Battery System Accelerates the Industrialization of Cylindrical Cells

Retrieved on: 
Wednesday, January 10, 2024

Cells of various shapes influence space utilization, safety design of the battery pack as well as the integration efficiency and costs of the battery system.

Key Points: 
  • Cells of various shapes influence space utilization, safety design of the battery pack as well as the integration efficiency and costs of the battery system.
  • Entering the cylindrical domain, BatteroTech has brought forth the BTL cylindrical cells based on the "Mercury" technology.
  • BatteroTech officially unveiled its BTL cylindrical battery system to accelerate the installation of cylindrical cells in electric vehicles.
  • The inherent safety advantage of large cylindrical cells lies in the cylindrical shape, which acts as an excellent pressure vessel.

Solaris Provides 2024 Preview Including Planned NYSE American Listing and Updated Warintza Mineral Resource Estimate in Q2/24

Retrieved on: 
Monday, January 8, 2024

NYSE American Listing – The Company intends to list on the NYSE American stock exchange (“NYSE American”) to satisfy the appetite of many U.S. retail and institutional investors seeking to add exposure to Solaris.

Key Points: 
  • NYSE American Listing – The Company intends to list on the NYSE American stock exchange (“NYSE American”) to satisfy the appetite of many U.S. retail and institutional investors seeking to add exposure to Solaris.
  • In advance of listing on the NYSE American, Solaris will file a Form 40-F Registration Statement with the United States Securities and Exchange Commission.
  • Subject to the review and approval of the listing application and satisfaction of all applicable listing and regulatory requirements, the Company expects its common shares to commence trading on the NYSE American in H1/24.
  • Notably, these intercepts included skarn mineralization (in addition to porphyry) for which the source has not yet been located.

Rebecca Malmquist is 2024 IAAO President

Retrieved on: 
Wednesday, January 3, 2024

KANSAS CITY, Mo., Jan. 3, 2024 /PRNewswire/ -- Rebecca Malmquist, CAE, assumed the office of President of the International Association of Assessing Officers (IAAO) on Jan. 1, 2024.

Key Points: 
  • KANSAS CITY, Mo., Jan. 3, 2024 /PRNewswire/ -- Rebecca Malmquist, CAE, assumed the office of President of the International Association of Assessing Officers (IAAO) on Jan. 1, 2024.
  • As the 2024 IAAO President, Ms. Malmquist is Chair of the Board of Directors.
  • In recent elections to join Ms. Malmquist on the IAAO Executive Committee for one-year terms, IAAO members elected Donna Vandervries, CAE, AAS, PPS, Esq., Equalization Director, Muskegon County, Michigan, as IAAO President-Elect/Treasurer; and William Healey, RES, Chief Assessor, City of Lewiston, Maine as IAAO Vice President.
  • 2023 IAAO President Patrick Alesandrini, CAE, RES, Hillsborough County, Florida, Chief Information Officer remains on the Executive Committee as 2024 Past President.

Dominica consolidates regulations, underscoring the Programme's integrity

Retrieved on: 
Tuesday, December 19, 2023

Dominica made changes in 2022 to applicable dependants which are reflected in this consolidated version of the CBI Regulations.

Key Points: 
  • Dominica made changes in 2022 to applicable dependants which are reflected in this consolidated version of the CBI Regulations.
  • AAs must be a citizen of Dominica and have their offices registered in Dominica with at least three staff.
  • AAs must also undergo independent due diligence checks, indicating Dominica’s commitment to integrity at every point in its programme.
  • These reinforced regulations not only strengthen the integrity of the CBI Programme but also reinforce Dominica’s position as a leading destination for investment.

LEADING EDGE RECEIVES CONTINUED HIGH GRADE COBALT-NICKEL RESULTS FROM SYSTEMATIC GALLERY CHIP SAMPLING, BIHOR SUD PROJECT, ROMANIA

Retrieved on: 
Thursday, December 14, 2023

LEADING EDGE RECEIVES CONTINUED HIGH GRADE COBALT-NICKEL RESULTS FROM SYSTEMATIC GALLERY CHIP SAMPLING, BIHOR SUD PROJECT, ROMANIA

Key Points: 
  • LEADING EDGE RECEIVES CONTINUED HIGH GRADE COBALT-NICKEL RESULTS FROM SYSTEMATIC GALLERY CHIP SAMPLING, BIHOR SUD PROJECT, ROMANIA
    - Highlights include 6.7% Co, 13.0% Ni, 7.5 g/t Au with 33% exceeding 0.44% Ni equivalent*
    Vancouver, December 14, 2023 – Leading Edge Materials Corp. (“Leading Edge Materials” or the “Company”) (TSXV: LEM) (Nasdaq First North: LEMSE) (OTCQB: LEMIF) (FRA: 7FL) is pleased to announce it has received further positive assay results for Co-Ni-Au from Gallery 7.
  • In combination with our mapping results, clearly outlining the structural context and strike/dip directions of mineralized zones, these findings yield immediate drill targets.
  • A total of 104 chip samples were collected from G7 (see Table 1), and extends the sampling and assay results reported on October 25, 2023.
  • Chip samples mostly of 0.5-2 kg, were collected from mineralized zones identified visually on mapping and by handheld XRF.

Lavras Gold Drills 204 metres Grading 1.0 g/t gold starting at a drill hole depth of 31 metres at its Fazenda do Posto Discovery, LDS Project in Southern Brazil

Retrieved on: 
Monday, November 27, 2023

TORONTO, Nov. 27, 2023 (GLOBE NEWSWIRE) -- Lavras Gold Corp. (TSX-V: LGC, OTCQX: LGCFF) reports that follow up drilling at the Fazenda do Posto discovery on the Company’s LDS Project in southern Brazil has validated the discovery reported in August 2023 (Lavras Gold press release August 29, 2023). The discovery has been confirmed in terms of gold grades, widths and continuity and remains open in several directions to resource expansion.

Key Points: 
  • Vertical Hole 23FP003 drilled 58 metres grading 1.0 g/t gold starting at a drillhole depth of 80 metres within a larger gold mineralized interval of 214 metres.
  • Continuous gold mineralization was encountered in 23FP006 starting at a drill hole depth of 31 metres (vertical depth of about 27 metres) for 230 metres.
  • The highlights of drill hole 23FP002 are 340 metres grading 1.1 g/t gold from 117 metres including:
    This hole confirms gold mineralization to a vertical depth of about 390 metres.
  • The hole returned assay results with continuous mineralization of 230 metres grading 0.9 g/t gold starting at 31 metres and including:
    204 metres grading 1.0 g/t gold from 31 metres including:
    65 metres grading 1.9 g/t gold from 149 metres; and including
    10 metres grading 3.0 g/t gold from 154 metres.