U.S. Gold Corp. Announces Positive Prefeasibility Study Citing a Pre-Tax NPV of $323 Million and IRR of 39.4%
Retrieved on:
Wednesday, December 1, 2021
Operate, Metallurgy, DEQ, Ferguson, PFS, Risk, Curt Gowdy, Wyoming Game and Fish Department, Filtration, Mining, Process flowsheeting, Feasibility study, Propylitic alteration, Environmental quality, Bureau of Indian Affairs, Recycling, Gold, University, SGS, Curt Gowdy State Park, Wyoming Department of Environmental Quality, Water, FLSmidth, University of Wyoming, TSF, ROM, Project, Crystal, Cattle, King Ranch (Tully River Station), Data, Bureau, Extreme metal, KCA, Engineering, Kerala State Land Bank, Clean Water Rule, Laramie Mountains, Corps, Copper, Metavolcanic rock, Portland District, U.S. Army Corps of Engineers, Silver, Life, Growth, SAG, Water quality, Quartz monzonite, Construct, Laboratory, Mineralogy, Program, City, Zaporizhzhia State Engineering Academy, Permit, G&A, Holy Qurbana, Uranium
CK Gold mineralization has been interpreted as a shear-zone controlled, disseminated and stockwork gold-copper deposit in Proterozoic intrusive rocks.
Key Points:
- CK Gold mineralization has been interpreted as a shear-zone controlled, disseminated and stockwork gold-copper deposit in Proterozoic intrusive rocks.
- The CK Gold Project is planned as an open pit mine with a mine production life of approximately 9.5 years.
- An after tax, discounted cash flow model was developed to assess the economic performance of the CK Gold Project.
- The positive economic outcome of the financial analysis is used to delineate the CK Gold Mineral Reserve.