Brixton Metals Drills 253m of 1.40 g/t Gold Including 93m of 3.22 g/t Gold Including 20m of 10.77 g/t Gold at its Trapper Target on the Thorn Project
Gold mineralization at Trapper is structurally controlled, and northwest, east-west and northeast trends have been identified.
- Gold mineralization at Trapper is structurally controlled, and northwest, east-west and northeast trends have been identified.
- The current drilling at the Trapper Target is located about 7km southeast from the Camp Creek Copper Porphyry Target.
- THN22-256 intercepted the quartz diorite at surface with grades of 138.00m of 1.20 g/t Au, including 46.39m of 1.84 g/t Au, including 17.59m of 4.09g/t Au and including 8.34m of 5.02 g/t Au.
- Hole 220 intercepted 322.33m of 0.33 g/t Au, including 121.00m of 0.72 g/t Au including 61.00m of 1.08 g/t Au, including 28.00m of 2.12 g/t Au and including 7.00m of 7.72 g/t Au.