Archean

Spod Lithium Announces Discovery Of Several Pegmatite Outcrops At Spod’s Megali Lithium Project In James Bay Quebec

Retrieved on: 
Wednesday, October 4, 2023

VANCOUVER, British Columbia, Oct. 04, 2023 (GLOBE NEWSWIRE) -- SPOD LITHIUM CORP. (“SPOD” or the “Company”) (CSE: SPOD) (OTCQB:SPODF) is pleased to provide shareholders with an exploration update on its MegaLi project located approximately fifty (50) kilometres south-southwest of the 2779 MW LG4 hydropower facility and 16 km from all-weather road access, JamesBay. The property consists of 78 mining claims covering a total area of 3,996.67 hectares (40 square kilometers) and is accessible by helicopter operating from a camp located along the hydropower reservoir.

Key Points: 
  • The MegaLi project shares its border with Patriot Battery Metals Inc’s Corvette property and is located about 3 km south from CV5 pegmatite system.
  • A significant discovery was made on Block “C” where multiple large pegmatite intrusions follow the north-east regional structural trend.
  • Host rocks of the pegmatite observed are composed mainly of amphibolite, although described as a tonalite on the MERN website.
  • Martin has put together a comprehensive exploration program on the Megali lands and more specifically on Block “C”.

United Lithium Stakes Third Hard-Rock Lithium Project in Wyoming, USA Within Historical Pegmatite Production Area: the Freedom Project

Retrieved on: 
Tuesday, October 3, 2023

This new project (“Freedom Project”) hosts numerous lithium and tantalum-bearing pegmatite bodies, several of which have been mined historically for lithium, tantalum, tungsten, beryllium, and feldspar.

Key Points: 
  • This new project (“Freedom Project”) hosts numerous lithium and tantalum-bearing pegmatite bodies, several of which have been mined historically for lithium, tantalum, tungsten, beryllium, and feldspar.
  • Scott Eldridge, United’s President, and CEO stated: “We are pleased to add a third hard-rock pegmatite project to our US portfolio.
  • The Project area covers public lands administered by the Bureau of Land Management (“BLM”) and one Wyoming state mineral lease.
  • The majority of those outside the Project are primarily gold excavations and one historic producer.

Deep-South Intersects 50 Metres of 0.63% CuEq, Including 16 Metres of 0.80% CuEq and 4 Metres of 2.57% CuEq From the 2021 Drilling Program Undisclosed Results

Retrieved on: 
Thursday, August 3, 2023

VANCOUVER, British Columbia, Aug. 03, 2023 (GLOBE NEWSWIRE) -- Deep-South Resources Inc. ("Deep-South" or “the Company") (TSX-V: DSM) announces the fourth batch of assay results from its drilling program interrupted in June 2021 at its Haib Copper project in southern Namibia. The program was interrupted when the Ministry of Mines and Energy of Namibia had denied the renewal of the Haib Copper licence EPL 3140. Results from 13 drill holes have been received in full after the renewal denial of the licence, with partial results received for 1 drill hole. The first 6 drill holes were previously reported. Following the completion of QA/QC the results for the remaining 7 holes are disclosed here.

Key Points: 
  • CuEq (copper equivalent) has been used to express the combined value of copper and molybdenum and is provided for illustrative purposes only.
  • Additionally, the hole was drilled to over 400m from surface to test the depth to which this mineralisation extends.
  • From 272m Cu grades increase significantly averaging 0.63% CuEq (0.57% Cu) over 50m along with elevated Mo grades.
  • The remaining 5,200 metres will be completed as part of the development program to be resume as soon as possible.

Deep-South Intersected 64 Metres of 0.61% CuEq, Including 16 Metres of 0.79% CuEq From 26 Metres Deep From the 2021 Drilling Program Undisclosed Results

Retrieved on: 
Wednesday, July 26, 2023

VANCOUVER, British Columbia, July 26, 2023 (GLOBE NEWSWIRE) -- Deep-South Resources Inc. ("Deep-South" or “the Company") (TSX-V: DSM) announces the third batch of assay results from its drilling program interrupted in June 2021 at its Haib Copper project in southern Namibia. The program was interrupted when the Ministry of Mines and Energy of Namibia had denied the renewal of the Haib Copper licence EPL 3140. Results from 12 drill holes have been received after the renewal denial of the licence. As the license has been renewed on July 2023, we can now disclose the results. We have completed our QA / QC on the first 6 drill holes. The QA \ QC on the remaining results is underway and they will be disclosed within 7 day. A total of 22 holes were drilled and 19 were sent for assaying. The remaining 3 samples will be prepared and eventually sent for assaying.

Key Points: 
  • CuEq (copper equivalent) has been used to express the combined value of copper and molybdenum and is provided for illustrative purposes only.
  • HM28 was drilled towards the southwest in the Pit 3 target area to determine the western limit of the high-grade mineralization present here.
  • HM31 had to be abandoned at 104.54m and was redrilled with HM31R, following a 1m shift in the collar position.
  • This hole was drilled through the high-grade mineralisation in the Pit 3 area returning 64m at 0.61% CuEq (0.60% Cu) including 16m at 0.79% CuEq.

Spod Lithium Corp. Samples 1.5% Li20 at Niemi Pegmatite Project

Retrieved on: 
Thursday, July 13, 2023

VANCOUVER, British Columbia, July 13, 2023 (GLOBE NEWSWIRE) -- SPOD LITHIUM CORP. (“SPOD” or the “Company”) (CSE: SPOD) (OTCQB:SPODF) has provided an update on the 2023 Phase I surface exploration program for its 100% owned NORTH NIPIGON – NIEMI PROJECT in the Georgia Lake Pegmatite Field, Ontario.

Key Points: 
  • VANCOUVER, British Columbia, July 13, 2023 (GLOBE NEWSWIRE) -- SPOD LITHIUM CORP. (“SPOD” or the “Company”) (CSE: SPOD) (OTCQB:SPODF) has provided an update on the 2023 Phase I surface exploration program for its 100% owned NORTH NIPIGON – NIEMI PROJECT in the Georgia Lake Pegmatite Field, Ontario.
  • Spod Lithium sampled 1.507% Li2O and continues to expand the mineralized area on the Niemi Block near (MDI42E05SW00017).
  • The Phase I program is designed to target spodumene bearing pegmatite bodies on our expansive land package in the heart of the prolific Georgia Lake Pegmatite Field.
  • The Project is contiguous with RockTech Lithium’s Georgia Lake Project and Imagine Lithium’s Jackpot Lithium Project.

Collective Metals Signs Definitive Agreement to Acquire 100% of the Lithium Whitemud Project in Northwestern Ontario

Retrieved on: 
Wednesday, July 12, 2023

587016 owns 100% of the Whitemud Project (the “Project”), a lithium property in Ontario consisting of 381 single cell mining claims totaling 7,775 hectares.

Key Points: 
  • 587016 owns 100% of the Whitemud Project (the “Project”), a lithium property in Ontario consisting of 381 single cell mining claims totaling 7,775 hectares.
  • Chief Executive Officer of Collective Metals, Christopher Huggins, commented “The Whitemud Project is a strategic addition to our Lithium portfolio, as it neighbours our Landing Lake Project and expands our presence in Northwestern Ontario.
  • Nearby projects include the Seymour Lake Lithium Project owned by Green Technology Metals which hosts a 9.9Mt resource grading 1.04% Li 2 O .
  • Perrault Falls area high density regional lake sediment geochemical survey, northwestern Ontario: Operation Treasure Hunt; Ontario Geological Survey, Open File Report 6092, 84p.

Canada Silver Cobalt Reports Promising 6.07 g/t Gold During Prospecting Near Miller Lake at Castle

Retrieved on: 
Wednesday, July 5, 2023

Through prospecting, stripping and new geophysics, CCW is poised to find additional targets for unlocking mineralization potential.

Key Points: 
  • Previous reports of gold at the Castle Mine property were mainly in drill intercepts well below the surface.
  • Canada Silver Cobalt remains highly encouraged by the results of its prospecting efforts, which we believe will continue to reveal substantial gold and silver mineralization prospects.
  • In addition to the ongoing prospecting activities, Canada Silver Cobalt is utilizing cutting-edge technology to enhance its exploration capabilities.
  • "This exciting report of a 6 g/t gold sample near Miller Lake marks a significant milestone for Canada Silver Cobalt," said Mr. Halliday.

VICTORY BATTERY METALS DELIVERS LETTER TO SHAREHOLDERS OUTLINING ACTIVE EXPLORATION PROGRAMS AND PLANS

Retrieved on: 
Thursday, June 29, 2023

Victory’s holdings represent a large ground position in an underexplored area within an emerging lithium district.

Key Points: 
  • Victory’s holdings represent a large ground position in an underexplored area within an emerging lithium district.
  • The Stingray property array is currently 17,813 hectares south of Patriot Battery Metals Corvette (TSXV: PMET) Property.
  • The Stingray claim blocks range from adjacent to the Corvette to several kilometers away and span over 65 km of east to west strike length.
  • Based on regional geology these intrusive rocks abut the volcanic sequence of the James Bay Greenstone belt.

Spod Lithium Corp. Provides Exploration Update on North Nipigon/Niemi Pegmatite Project

Retrieved on: 
Thursday, June 15, 2023

VANCOUVER, British Columbia, June 15, 2023 (GLOBE NEWSWIRE) -- SPOD LITHIUM CORP. (“SPOD” or the “Company”) (CSE: SPOD) (OTCQB:SPODF) is pleased to provide an exploration update on it’s Phase I exploration program for its 100% owned North Nipigon / Niemi Lithium project in the Georgia Lake Pegmatite Field, Ontario.

Key Points: 
  • VANCOUVER, British Columbia, June 15, 2023 (GLOBE NEWSWIRE) -- SPOD LITHIUM CORP. (“SPOD” or the “Company”) (CSE: SPOD) (OTCQB:SPODF) is pleased to provide an exploration update on it’s Phase I exploration program for its 100% owned North Nipigon / Niemi Lithium project in the Georgia Lake Pegmatite Field, Ontario.
  • The program covered the Niemi Block, North Nipigon Block A and North Nipigon Block C (Figure 1).
  • The Project is contiguous with RockTech Lithium’s Georgia Lake Project and Imagine Lithium’s Jackpot Lithium Project.
  • The information provides an indication of the exploration potential of the Property but may not be representative of expected results.

Spod Lithium Corp. to Begin Exploration Program at North Nipigon/Niemi Pegmatite Project

Retrieved on: 
Thursday, May 11, 2023

VANCOUVER, British Columbia, May 11, 2023 (GLOBE NEWSWIRE) -- SPOD LITHIUM CORP. (“SPOD” or the “Company”) (CSE: SPOD) (OTCQB:SPODF) is pleased to announce its initial exploration plan for its 100% wholly owned North Nipigon / Niemi Lithium project in Ontario.

Key Points: 
  • VANCOUVER, British Columbia, May 11, 2023 (GLOBE NEWSWIRE) -- SPOD LITHIUM CORP. (“SPOD” or the “Company”) (CSE: SPOD) (OTCQB:SPODF) is pleased to announce its initial exploration plan for its 100% wholly owned North Nipigon / Niemi Lithium project in Ontario.
  • The North Nipigon – Niemi Lithium Project is adjacent to Rock Tech’s Georgia Lake Deposit and Imagine Lithium’s Jackpot project.
  • SPOD has retained DCX Geological Consulting to design and implement an aggressive exploration program on its 8,679-hectare project.
  • The Project is contiguous with RockTech Lithium’s Georgia Lake Project and Imagine Lithium’s Jackpot Lithium Project.