EQS-News: Ongoing feasibility study for battery plant for CERENERGY® sees significantly higher annual production capacity
Through technical optimization, the annual production capacity could be increased from previously 100 MWh for CERENERGY plant in Schwarze Pumpe to 120MWh.
- Through technical optimization, the annual production capacity could be increased from previously 100 MWh for CERENERGY plant in Schwarze Pumpe to 120MWh.
- Heidelberg (02.11.2023): Altech Advanced Materials AG (FRA: AMA1) will significantly expand its production capacity at the CERENERGY® solid-state sodium chloride battery production facility in Schwarze Pumpe, Saxony, Germany, to at least 120 MWh annually.
- Altech is currently preparing a comprehensive feasibility study for the realization of the production plant.
- Through optimized design, we have succeeded in significantly expanding production capacity without incurring additional investment costs for Altech.