Nine Mile Metals Engages GEMTEC and Completes Nine Mile Brook Lens Bulk Sample Baseline Sampling
GEMTEC completed the water, sediment, and flow sampling program on September 8, 2023, in support of the Project.
- GEMTEC completed the water, sediment, and flow sampling program on September 8, 2023, in support of the Project.
- Proper QA/QC protocols were followed, which included submitting two duplicate samples for laboratory analyses—namely, one surface water sample and one sediment sample.
- The locations were selected based on 1:50,000 topo map drainage, and cover Nine Mile Brook, Boucher Brook, and a tributary to Nine Mile Brook located south of the Project.
- Patrick J. Cruickshank, CEO and Director, stated, “We are pleased to advance our Nine Mile Brook Lens bulk sample program to the next level.