Atico Reports High Grade Intercepts up to 4.45m of 5.17% Cu, 10.47g/t Au and 4.90m of 9.35% Cu, 2.94 g/t Au and Continues to Extend the Ore Body at El Roble Mine in Colombia
During the first quarter of 2023, the Company began a drill program to test the main mineralized body and the immediately adjacent area.
- During the first quarter of 2023, the Company began a drill program to test the main mineralized body and the immediately adjacent area.
- The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia.
- Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.
- Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit.