Titan Reports 16% Increase in Production While Lowering Costs
Deepening of the lower Mahler ramp system provided access to high-grade ore in the Lower Mahler mining zone that supported strong grades and record metal production.
- Deepening of the lower Mahler ramp system provided access to high-grade ore in the Lower Mahler mining zone that supported strong grades and record metal production.
- It is expected that ore from this zone will continue to support budgeted zinc grades for FY2024.
- Major projects completed include the counter-weight rail replacement for the service cage and purchase of a telehandler for underground material movement.
- A total of 7,984 ft was drilled, with mineralization intercepted 600 ft down dip from the current active faces of Lower Mahler.