Kiboko Gold Drills Multiple High-grade Intervals Including 8.7 g/t Au Over 9 m and 23.9 g/t Au Over 3 m at its Harricana Gold Project
As shown in figures 1 and 2, the Harricana Project (the “Project” or “Harricana Project”) is located 55 kilometres north of Val-d’Or, Québec, in the world-renowned Abitibi gold belt.
- As shown in figures 1 and 2, the Harricana Project (the “Project” or “Harricana Project”) is located 55 kilometres north of Val-d’Or, Québec, in the world-renowned Abitibi gold belt.
- To date, 2 holes (totalling 540 m of drilling) have been completed as part of the Company’s ongoing 12-hole / 2,800 m winter diamond drilling program.
- In addition to intercepting several exciting high-grade intervals, many lower grade intervals were intersected in this first batch of assay results.
- Further investigation is necessary, including the study of gold grain size distribution, gold content, and representative sub-sample sizes for assaying is necessary.