Bop

Le Mans Ultimate announces Early Access release plan ahead of February launch

Retrieved on: 
Thursday, February 1, 2024

Motorsport fans can start their Le Mans Ultimate journey through either Online events, powered by the latest version of RaceControl coming to Le Mans Ultimate, or Single Player Race Weekends.

Key Points: 
  • Motorsport fans can start their Le Mans Ultimate journey through either Online events, powered by the latest version of RaceControl coming to Le Mans Ultimate, or Single Player Race Weekends.
  • Game development will be a collaborative process with Le Mans Ultimate providing regular updates on the build of the game, fixes, features, content development and quality of life updates.
  • “397 laps is the highest number of laps ever completed by a team at Le Mans, giving Studio 397 its unique name.
  • For further information on Le Mans Ultimate visit www.lemansultimate.com or the games’ social media channels or by visiting Le Mans Ultimate on Steam and Wishlisting the product today to keep up to date with all developments.

Introducing the new Porsche 911 GT3 R rennsport

Retrieved on: 
Friday, September 29, 2023

The 911 GT3 R rennsport, with a power output of up to 611 hp, is based on the new 911 GT3 R of the current 992 generation.

Key Points: 
  • The 911 GT3 R rennsport, with a power output of up to 611 hp, is based on the new 911 GT3 R of the current 992 generation.
  • The Porsche 911 GT3 R rennsport combines the powerful appearance of a high-performance race car with modern design elements.
  • "The 911 GT3 R rennsport will take its place as the logical successor to the modern Porsche 935, itself revealed at Rennsport Reunion 6 in 2018.
  • While the 935 was technically based on the near-standard 911 GT2 RS Clubsport, the 911 GT3 R rennsport uses the current 911 GT3 R of the 992 generation as its basis.

Avery Dennison Commissions Europe’s Largest Concentrated Solar Thermal Platform and Thermal Storage Unit in Turnhout, Belgium

Retrieved on: 
Wednesday, September 6, 2023

Avery Dennison, a leading global packaging and materials manufacturer, today commissioned Europe’s largest Concentrated Solar Thermal (CST) platform and Thermal Storage unit at its production plant in Turnhout, Belgium.

Key Points: 
  • Avery Dennison, a leading global packaging and materials manufacturer, today commissioned Europe’s largest Concentrated Solar Thermal (CST) platform and Thermal Storage unit at its production plant in Turnhout, Belgium.
  • The renewable energy project contains a Concentrated Solar Thermal platform with 2,240 surface mirrors, with a solar field peak yield of 2.7 GWh thermal power, and six thermal storage modules with a capacity of 5 MWh thermal power.
  • View the full release here: https://www.businesswire.com/news/home/20230906241289/en/
    Europe's largest Concentrated Solar Thermal (CST) platform and Thermal Storage unit at Avery Dennison's production plant in Turnhout, Belgium.
  • Here in Turnhout, Avery Dennison, Azteq, ENERGYNEST and Campina Energie prove exactly that, by commissioning Europe’s largest Concentrated Solar Thermal Platform and Thermal Storage Unit.

Knight Energy Services Acquires Platinum Pipe Rentals

Retrieved on: 
Monday, June 5, 2023

Knight Energy Services (“Knight”), a portfolio company of Voyager Interests (“Voyager”), today announced its acquisition of Platinum Pipe Rentals (“Platinum”).

Key Points: 
  • Knight Energy Services (“Knight”), a portfolio company of Voyager Interests (“Voyager”), today announced its acquisition of Platinum Pipe Rentals (“Platinum”).
  • Platinum, headquartered in Odessa, Texas, is a leading drill pipe and tubing rental operation focused on the Permian Basin and the Eagle Ford Shale.
  • “The Platinum team and I are thrilled to be partnering with Knight.
  • Headquartered in Odessa, Texas with a facility in Devine, Texas, Platinum is a leading provider of premium drill pipe and tubing rental services in west Texas.

Mitsubishi Power to Supply Technology to Brazil’s Largest Peaking Power Plant in Support of Country’s Energy Transition

Retrieved on: 
Tuesday, May 16, 2023

The four state-of-the-art M501JAC gas turbines will operate in simple cycle at UTE Portocem providing much needed generation capacity in Brazil.

Key Points: 
  • The four state-of-the-art M501JAC gas turbines will operate in simple cycle at UTE Portocem providing much needed generation capacity in Brazil.
  • UTE Portocem will be one of the largest power plants ever built in Latin America and will boast 1.6 gigawatts (GW) of installed capacity.
  • “The UTE Portocem power plant is a historic project for Brazil, allowing for an efficient energy transition and ensuring the reliability of the national electrical system.
  • Portocem has selected state-of-the-art technology by choosing Mitsubishi Power and a construction company with extensive experience in building this type of project – CONSAG,” said Ronan Dias, CEO of Portocem.

NOV Reports Fourth Quarter and Full Year 2022 Results

Retrieved on: 
Monday, February 6, 2023

NOV Inc. (NYSE: NOV) today reported fourth quarter 2022 revenues of $2.07 billion, an increase of 10 percent compared to the third quarter of 2022 and an increase of 37 percent compared to the fourth quarter of 2021.

Key Points: 
  • NOV Inc. (NYSE: NOV) today reported fourth quarter 2022 revenues of $2.07 billion, an increase of 10 percent compared to the third quarter of 2022 and an increase of 37 percent compared to the fourth quarter of 2021.
  • Completion & Production Solutions generated revenues of $738 million in the fourth quarter of 2022, an increase of eight percent from the third quarter of 2022 and an increase of 34 percent from the fourth quarter of 2021.
  • Rig Technologies generated revenues of $620 million in the fourth quarter of 2022, an increase of 21 percent from the third quarter of 2022 and an increase of 44 percent from the fourth quarter of 2021.
  • NOV will hold a conference call to discuss its fourth quarter 2022 results on February 7, 2023 at 10:00 AM Central Time (11:00 AM Eastern Time).

Woodward Selected by Airbus to Provide Balance of Plant Solution for ZEROe Fuel Cell Demonstrator Contributing to Zero-Emission Flight

Retrieved on: 
Monday, December 5, 2022

Woodward will contribute advanced design capabilities and world-leading fuel technologies to the ZEROe project for more sustainable air travel based on hydrogen propulsion.

Key Points: 
  • Woodward will contribute advanced design capabilities and world-leading fuel technologies to the ZEROe project for more sustainable air travel based on hydrogen propulsion.
  • Woodward’s BoP will contribute an essential part of the project, with a comprehensive package of monitoring and control means for hydrogen fuel and air for the hydrogen fuel cell system.
  • “We’re pleased Airbus has decided to work with Woodward to provide component solutions to meet its high standards of safety, efficiency and performance for its ZEROe Fuel Cell demonstrator,” said Terry Voskuil, President, Woodward Aerospace.
  • “The ZEROe project will provide important solutions in the portfolio for emission-free flying and will help fulfill the decarbonization goal.

Nel ASA: Receives Purchase Order for a Containerized PEM Water Electrolyser in Australia

Retrieved on: 
Monday, October 17, 2022

Nel Hydrogen Electrolyser AS, a subsidiary of Nel ASA (Nel, OSE:NEL), has entered into a contract for alkaline electrolyser equipment from Australian company Woodside Energy for its proposed hydrogen project, H2OK, in Ardmore in the state of Oklahoma, US.

Key Points: 
  • Nel Hydrogen Electrolyser AS, a subsidiary of Nel ASA (Nel, OSE:NEL), has entered into a contract for alkaline electrolyser equipment from Australian company Woodside Energy for its proposed hydrogen project, H2OK, in Ardmore in the state of Oklahoma, US.
  • H2OK is Woodsides first hydrogen project in the US, this equipment will support phase 1 of the proposed project (60 tpd).
  • Woodside will site the facility in Ardmore, Oklahoma, an area well suited for hydrogen production with good availability of water and energy.
  • The contract with Woodside was signed only a couple of months after Nel received its record size 200 MW purchase order for another large-scale project in the US.

Nel ASA: Receives a NOK 600 million purchase order from Woodside Energy

Retrieved on: 
Monday, October 17, 2022

The contract has a total value of about NOK 600 million.

Key Points: 
  • The contract has a total value of about NOK 600 million.
  • Woodside will site the facility in Ardmore, Oklahoma, an area well suited for hydrogen production with good availability of water and energy.
  • Woodside Energy is looking to expand its US footprint and is also working on two proposed hydrogen projects in Australia: H2Perth and H2Tas.
  • The contract with Woodside was signed only a couple of months after Nel received its record size 200 MW purchase order for another large-scale project in the US.

Nel ASA: Receives a NOK 600 million purchase order from Woodside Energy

Retrieved on: 
Monday, October 17, 2022

The contract has a total value of about NOK 600 million.

Key Points: 
  • The contract has a total value of about NOK 600 million.
  • Woodside will site the facility in Ardmore, Oklahoma, an area well suited for hydrogen production with good availability of water and energy.
  • Woodside Energy is looking to expand its US footprint and is also working on two proposed hydrogen projects in Australia: H2Perth and H2Tas.
  • The contract with Woodside was signed only a couple of months after Nel received its record size 200 MW purchase order for another large-scale project in the US.