Callinex Intersects 67m of 2.73% Copper and 20.53m of 2.58% Copper in Step-outs at the Rainbow Deposit in the Flin Flon Mining District, MB
PBM-129-W2 is located 60m along strike to the south of PBM-113-W1 and 67m vertically above PBM-129-W1 ( Rainbow Deposit Long Section ).
- PBM-129-W2 is located 60m along strike to the south of PBM-113-W1 and 67m vertically above PBM-129-W1 ( Rainbow Deposit Long Section ).
- Max Porterfield, President and CEO, stated, "The drill results announced today represent the two widest intersections to date at the Rainbow Deposit.
- Drilling over the summer will continue to focus on building a high-grade copper resource at the Pine Bay Project."
- Callinex will continue to provide results on an ongoing basis for the duration of the 2021 drilling campaign.