Drilling

REPEAT -- Metallica Metals Identifies Numerous Drill Targets for Its Starr Project, Thunder Bay Mining District

Retrieved on: 
Wednesday, July 28, 2021

Paul Tnire, CEO and Director of Metallica Metals commented, Metallica Metals is very pleased with the results of the structural and geophysical interpretation on the Starr Project, which sets the stage for our upcoming maiden drilling program.

Key Points: 
  • Paul Tnire, CEO and Director of Metallica Metals commented, Metallica Metals is very pleased with the results of the structural and geophysical interpretation on the Starr Project, which sets the stage for our upcoming maiden drilling program.
  • We have identified a significant amount of drill targets that are both significantly advanced with known surface gold occurrences as well as grassroots targets that have never been tested.
  • Drill targeting was completed through a combination of these structures as well as IP and EM data and proximity to known mineralization.
  • Metallica Metals will utilize these targets as well as existing targets located below known high-grade surface gold occurrences to finalize its upcoming diamond drilling program.

Great Bear Completes Phase 1 Grid Drilling to 450 m Depth at LP Fault: 440 Holes, 222,500 m Drilled Since May 2019 Discovery

Retrieved on: 
Wednesday, July 28, 2021

Chris Taylor, President and CEO of Great Bear said, "We have now completed 440 drill holes at the LP Fault, and our Phase 1 drill grid is substantially complete to an average 450 metres depth along over 4 kilometres of strike length.

Key Points: 
  • Chris Taylor, President and CEO of Great Bear said, "We have now completed 440 drill holes at the LP Fault, and our Phase 1 drill grid is substantially complete to an average 450 metres depth along over 4 kilometres of strike length.
  • Great Bear has approximately $83 million in cash on hand and is funded through 2022.
  • In total, Great Bear has completed 630 drill holes totaling 283,000 metres into all gold zones since beginning drilling at the Dixie Project in summer 2017.
  • Great Bear Resources Ltd.is a well-financed gold exploration company managed by a team with a track record of success in mineral exploration.

Metallica Metals Identifies Numerous Drill Targets for Its Starr Project, Thunder Bay Mining District

Retrieved on: 
Wednesday, July 28, 2021

Paul Tnire, CEO and Director of Metallica Metals commented, Metallica Metals is very pleased with the results of the structural and geophysical interpretation on the Starr Project, which sets the stage for our upcoming maiden drilling program.

Key Points: 
  • Paul Tnire, CEO and Director of Metallica Metals commented, Metallica Metals is very pleased with the results of the structural and geophysical interpretation on the Starr Project, which sets the stage for our upcoming maiden drilling program.
  • We have identified a significant amount of drill targets that are both significantly advanced with known surface gold occurrences as well as grassroots targets that have never been tested.
  • Drill targeting was completed through a combination of these structures as well as IP and EM data and proximity to known mineralization.
  • Metallica Metals will utilize these targets as well as existing targets located below known high-grade surface gold occurrences to finalize its upcoming diamond drilling program.

CAVU Completes First Three Drill Holes on Hopper Copper-Gold Project and Sends Core to Lab for Testing

Retrieved on: 
Tuesday, July 27, 2021

The Hopper Project is in the traditional territory of the Champagne and Aishihik First Nations.

Key Points: 
  • The Hopper Project is in the traditional territory of the Champagne and Aishihik First Nations.
  • Three holes were drilled in the Franklin skarn and have been logged, sampled and sent to MS Analytical in Langley for assays.
  • The porphyry hole will be the second diamond drill hole to ever test the porphyry mineralization on the claim.
  • "We are encouraged by our findings from the skarn drilling so far," stated Jaap Verbaas, CEO of CAVU Mining.

Brixton Metals Discovers Visible Gold at Surface Above a Large Geophysical Feature at the Thorn Project’s Trapper Gold Target

Retrieved on: 
Monday, July 26, 2021

The Trapper Gold Target is located about 8km southeast from the Camp Creek Target.

Key Points: 
  • The Trapper Gold Target is located about 8km southeast from the Camp Creek Target.
  • The Trapper Target represents a volcanic hosted epithermal gold target where soil and rock sampling have identified a 7.5km long northwest trending gold anomaly.
  • Forty-two drill holes totaling 8581m were drilled at the Trapper Target in 2011.
  • Brixton completed 2,700m of drilling so far this 2021 season and is currently drilling.

Borr Drilling Limited - Announcement of Letter of Award for jack-up drilling rig

Retrieved on: 
Thursday, July 22, 2021

HAMILTON, Bermuda, July 22, 2021 /PRNewswire/ -- Borr Drilling Limited ("Borr Drilling") (NYSE: BORR) (OSE: BORR) is pleased to announce that it has received a Letter of Award from an international oil company for additional work in Mexico.

Key Points: 
  • HAMILTON, Bermuda, July 22, 2021 /PRNewswire/ -- Borr Drilling Limited ("Borr Drilling") (NYSE: BORR) (OSE: BORR) is pleased to announce that it has received a Letter of Award from an international oil company for additional work in Mexico.
  • The program is expected to commence in the second quarter of 2022 for a duration of approximately 150 days, adding revenues of USD 15.7 million.
  • These forward-looking statements are made only as of the date of this release.
  • We do not undertake to update or revise the forward-looking statements, whetheras a result ofnew information, future events or otherwise.

A.I.S. Resources Continues Fast-tracking of Drilling Program at Toolleen, Yalgogrin and Kingston Australia

Retrieved on: 
Thursday, July 22, 2021

Resources Limited( TSX: AIS, OTCQB: AISSF ) (the Company or AIS)announces after successful financing it will soon start additional drilling at its highly prospective Australian properties at Toolleen, Yalgogrin and Kingston.

Key Points: 
  • Resources Limited( TSX: AIS, OTCQB: AISSF ) (the Company or AIS)announces after successful financing it will soon start additional drilling at its highly prospective Australian properties at Toolleen, Yalgogrin and Kingston.
  • Soil sampling will start in August once the heavy seasonal rains abate, followed by RC drilling to hone in on these structures.
  • Upon receipt of all results, an RC program will be planned to test the Walshs lode with infill drilling and extensions.
  • Details of the RC program will be finalized pending the results of the diamond drilling program.

Target Program Completed at Red Mountain

Retrieved on: 
Thursday, July 22, 2021

There have been no new drilling results at Red Mountain.

Key Points: 
  • There have been no new drilling results at Red Mountain.
  • The words believe, expect, anticipate, indicate, contemplate, target, plan, intends, continue, budget, estimate, may, will, schedule and similar expressions identify forwardlooking statements.
  • Set out below is Section 1 and Section 2 of Table 1 under the JORC Code, 2012 Edition for the Red Mountain project.
  • Holes range from vertical to an inclination of -60 degrees depending on the attitude of the target and the drilling method.

Imperial Reports Red Chris Production and Exploration Update for 2021 Second Quarter

Retrieved on: 
Thursday, July 22, 2021

During the second quarter there were up to eight drill rigs in operation, completing 26 drill holes for a total of about 30,055 drilled metres.

Key Points: 
  • During the second quarter there were up to eight drill rigs in operation, completing 26 drill holes for a total of about 30,055 drilled metres.
  • Since the commencement of the Joint Venture in 2019, 137 drill holes totalling about 166,686 metres have been drilled.
  • Jim Miller-Tait, P.Geo., Imperial Metals Vice President Exploration, is the designated Qualified Person as defined by National Instrument 43-101 for the Red Chris exploration program and has reviewed this news release.
  • Red Chris samples for the 2021 drilling reported were analysed at Bureau Veritas Mineral Laboratories in Vancouver.

Newcore Gold Drilling Intersects 95.16 g/t Gold Over 2.0 Metres and 1.28 g/t Gold Over 74.0 Metres, at the Enchi Gold Project, Ghana

Retrieved on: 
Wednesday, July 21, 2021

Drilling on the central portion of Boin included five diamond drill holes totalling 2,629 metres (KBDD063A, KBRD063, KBDD064, KBDD066, KBDD067) and one RC hole KBRC253 of114 metres.

Key Points: 
  • Drilling on the central portion of Boin included five diamond drill holes totalling 2,629 metres (KBDD063A, KBRD063, KBDD064, KBDD066, KBDD067) and one RC hole KBRC253 of114 metres.
  • The holes were completed along a one-kilometre portion of the structure, directed at extending the gold mineralization up and down dip.
  • Four of the five holes intersected mineralization characterized by wide gold mineralized zones with a series of higher-grade core structures.
  • As part of the current drill program a total of 157 holes totalling 25,648 metres have been completed at Boin.