Primergy Solar Signs Sole Battery Supply Agreement with CATL for the Monumental 690 MW Gemini Solar + Storage Project
Once completed, Gemini will be one of the largest operational solar + storage projects in the U.S. with a 690 MWac/966 MWdc solar array and 1,416 MWh storage capability.
- Once completed, Gemini will be one of the largest operational solar + storage projects in the U.S. with a 690 MWac/966 MWdc solar array and 1,416 MWh storage capability.
- We believe our cooperation on the Gemini Solar Project will set a great example for large-scale electrochemical energy storage applications, thus promoting global drive towards carbon neutrality.
- Primergy designed an innovative DC coupled system for the Gemini project, which will maximize efficiency from the teaming of the solar array with the CATL storage system.
- CATL will supply Primergy Solar with EnerOne, a modular outdoor liquid cooling battery energy storage system that features long service life, high integration, and high degree of safety.