Huntington Beach Desalination Plant to Preserve, Enhance and Restore Bolsa Chica Ecological Reserve

×

Error message

  • Notice: Undefined property: stdClass::$ds_changed in eval() (line 16 of /var/www/7/modules/php/php.module(80) : eval()'d code).
  • Notice: Undefined property: stdClass::$ss_search_api_url in eval() (line 20 of /var/www/7/modules/php/php.module(80) : eval()'d code).
  • Notice: Undefined property: stdClass::$tm_title in eval() (line 20 of /var/www/7/modules/php/php.module(80) : eval()'d code).

HUNTINGTON BEACH, Calif., July 9, 2020 /PRNewswire/ --In conjunction with the operation of its proposed Huntington Beach Desalination Project, the Santa Ana Regional Water Quality Control Board issued a final draft permit on June 30th that requires Poseidon Water to assume responsibility for the preservation, enhancement and restoration of the Ecological Reserve (Bolsa Chica) wetlands.