Final 2023 Drill Hole Results for CV5 at Corvette including 133.9 m at 1.21% Li2O and Extending Strike to 4.6 km

133.9 m at 1.21% Li2O, including 41.5 m at 1.52% Li2O; and 42.2 m at 1.59% Li2O, including 10.1 m at 3.22% Li2O (CV23-298).