Logility Maximizes Production Efficiencies with Advanced Scheduling Capabilities

×

Error message

  • Notice: Undefined property: stdClass::$ds_changed in eval() (line 16 of /var/www/7/modules/php/php.module(80) : eval()'d code).
  • Notice: Undefined property: stdClass::$ss_search_api_url in eval() (line 20 of /var/www/7/modules/php/php.module(80) : eval()'d code).
  • Notice: Undefined property: stdClass::$tm_title in eval() (line 20 of /var/www/7/modules/php/php.module(80) : eval()'d code).

Today the pressure is on manufacturers to maximize margins, so every minute matters in production environments. That’s why the Synchronous Scheduling feature in Manufacturing Optimization addresses a crucial manufacturing challenge by allowing concurrent scheduling of multiple items on the same production resource with identical start and end times. This capability is particularly valuable for industries such as food and industrial durables--for example, in baking, curing, or drying processes where various items need to be processed simultaneously.