Lithium Ionic initiates 20,000m drill program at newly acquired Salinas Project, Minas Gerais, Brazil; following up on initial drill results of up to 1.53% Li2O over 11.36m and 1.22% Li2O over 13.76m

Two drill rigs are currently operating on the property, with an additional two expected to be mobilized in the coming weeks.