Brixton Metals Drills 253m of 1.40 g/t Gold Including 93m of 3.22 g/t Gold Including 20m of 10.77 g/t Gold at its Trapper Target on the Thorn Project

Gold mineralization at Trapper is structurally controlled, and northwest, east-west and northeast trends have been identified.