Patriot Drills 104.5 m of 0.97% Li2O and 61.9 m of 1.42% Li2O, and Extends Strike Length of Mineralization to 2.2 km at the CV5 Pegmatite, Corvette Property, Quebec

A third drill rig has been active at the CV13 pegmatite cluster for initial drill testing since early September.