Newcore Gold Drilling Intersects 2.33 g/t Gold Over 14.0 Metres, including 20.54 g/t Gold Over 1.0 Metre, at the Enchi Gold Project, Ghana

Drilling in this area tested a strike length of 500 metres, with drilling near the northern extent of the deposit encountering multiple zones of gold mineralisation including a high-grade core.