Great Bear Completes Phase 1 Grid Drilling to 450 m Depth at LP Fault: 440 Holes, 222,500 m Drilled Since May 2019 Discovery

Chris Taylor, President and CEO of Great Bear said, "We have now completed 440 drill holes at the LP Fault, and our Phase 1 drill grid is substantially complete to an average 450 metres depth along over 4 kilometres of strike length.