CORRECTION FROM SOURCE: Cerrado Gold Intercepts 41.7m at 2.51g/t Au, 10.8m at 2.83g/t Au, and 4.4m at 3.81g/t from Its Phase 2 District Drilling Program at Monte Do Carmo Project in Brazil

Results include mineralized lateral step outs in the Eastern Sector of Serra Alta beyond the current extent of the high-grade domain.