Cerrado Gold Intercepts 41.65m at 2.51g/t Au, 10.8m at 2.83g/t Au, 4.23m at 17.22g/t and 18.8m at 3.4g/t Au from Its Phase 2 District Drilling Program at Monte Do Carmo Project in Brazil

Results include mineralized lateral step outs in the Eastern Sector of Serra Alta beyond the current extent of the high-grade domain.