Palladium One Drills 7.4% Ni_Eq (164 lbs/tonne) over 4.5 Meters Including 10.2% Ni_Eq (224 lbs/tonne) over 1.7 Meters at Tyko Nickel-Copper Project, in Ontario, Canada

10.2% Ni_Eq (224 lbs/tonne) over 1.7 meters, within 7.4% Ni_Eq (164 lbs/tonne) over 4.5 meters, from 5 meters down hole (TK21-035), Upper Plate.