Cerrado Gold Reports 8.6m at 14.1g/t Au and 16.2m at 3.4g/t Au and 27m at 2.6g/t Au from Its Phase I Drill Program at Its Monte Do Carmo Open Pit Project in Brazil

The drill results highlighted in this release are from drill holes, FSA 111, FSA112, FSA113, and FSA124, FSA 126, FSA130 and FSA 133.