Turmalina Intersection of 72m at 3.47% Copper, 100 g/t Silver and 0.71 g/t Gold (5.0% CuEq) Extends Known Mineralisation at SFdLA 300m Below Previous Drilling in Eastern Lobe

After the interval of 72m @ 5.0% CuEq in Hole 39, the hole was terminated due to drill capability limit.