ISIN:DE000A2G8ZX8

EQS-News: Pyrum Innovations AG: Municipal council in Perl-Besch approves development plan for new Pyrum plant

Retrieved on: 
Donnerstag, Februar 8, 2024

Construction of the new Pyrum-owned plant in Perl-Besch (Saarland) to begin in the second half of 2024, first plant components already ordered

Key Points: 
  • Construction of the new Pyrum-owned plant in Perl-Besch (Saarland) to begin in the second half of 2024, first plant components already ordered
    Dillingen / Saar, 8 February 2024 – The municipal council of Perl-Besch on the Mosel in Saarland has approved the development plan for the site of the new plant of Pyrum Innovations AG ("Pyrum", the "Company", ISIN: DE000A2G8ZX8) by a large majority.
  • The wholly owned subsidiary "Pyrum GreenFactory II GmbH" was founded at the beginning of January to operate the second Pyrum plant in Saarland.
  • Pascal Klein, CEO of Pyrum Innovations AG: “We continue to push the pace.
  • Only around eight weeks have passed between the initial approval of the local and municipal councils for the establishment of Pyrum in December 2023 and the current adoption of the final development plan.

EQS-News: Pyrum Innovations AG: New reactor in Dillingen already at 75% output during second start-up run

Retrieved on: 
Mittwoch, Februar 7, 2024

Since the start of the second test run on Tuesday, 30 January 2024, the throughput of the new reactor has already been gradually increased to 75% of the expected output for future series production within a week.

Key Points: 
  • Since the start of the second test run on Tuesday, 30 January 2024, the throughput of the new reactor has already been gradually increased to 75% of the expected output for future series production within a week.
  • This means that industrial quantities of ELT can already be processed in TAD 2 and Pyrum's technology has provided proof of concept for the planned large-scale rollout.
  • Pascal Klein, CEO of Pyrum Innovations AG: “We are all incredibly proud of this result.
  • TAD 3 is also set to be ramped up to 80% by the end of March 2024, which means a tripling of the current production capacity.

EQS-News: Pyrum Innovations AG pushes ahead with expansion of production capacity

Retrieved on: 
Dienstag, Januar 30, 2024

Dillingen / Saar, 18 January 2024 – Pyrum Innovations AG (“Pyrum”, the “company”, ISIN: DE000A2G8ZX8), a pioneer in the sustainable recycling of end-of-life tyres (ELT) based on its patented pyrolysis technology, continues to consistently pursue its growth course.

Key Points: 
  • Dillingen / Saar, 18 January 2024 – Pyrum Innovations AG (“Pyrum”, the “company”, ISIN: DE000A2G8ZX8), a pioneer in the sustainable recycling of end-of-life tyres (ELT) based on its patented pyrolysis technology, continues to consistently pursue its growth course.
  • At the beginning of January, the wholly owned subsidiary "Pyrum GreenFactory II GmbH" was founded to operate the second Pyrum plant in Saarland.
  • Following the successful test, Pyrum intends to switch directly into permanent operation of the line with ongoing performance optimisations.
  • Pascal Klein, CEO of Pyrum Innovations AG: "While we are finalising the last work for the plant expansion in Dillingen, we are also starting the next chapter in Perl-Besch full of energy thanks to the financing agreement recently reached with BASF.

EQS-News: Pyrum Innovations AG: First pyrolysis oil produced in new reactor

Retrieved on: 
Samstag, Dezember 30, 2023

Dillingen / Saar, 9 November 2023 - Pyrum Innovations AG (“Pyrum”, the “Company”, ISIN: DE000A2G8ZX8), a pioneer in the sustainable recycling of end-of-life tyres (ELT) based on its patented pyrolysis technology, announces the first successful warm-up of the new reactor 2 at its main plant in Dillingen/Saar.

Key Points: 
  • Dillingen / Saar, 9 November 2023 - Pyrum Innovations AG (“Pyrum”, the “Company”, ISIN: DE000A2G8ZX8), a pioneer in the sustainable recycling of end-of-life tyres (ELT) based on its patented pyrolysis technology, announces the first successful warm-up of the new reactor 2 at its main plant in Dillingen/Saar.
  • In this context, the reactor was started up and heated to the production temperature of around 650 °C for the first time.
  • It was fed with granulate and the dosing system was successfully tested so that the first pyrolysis oil could be produced in small quantities.
  • Reactor 3 is to follow shortly afterwards.”
    After the initial warm-up, the reactor was shut down again in a controlled manner.